System settings
System settings is where an administrator adapts the application to the organization. To open it, choose System settings in the main menu (gear icon). System settings are available to system administrators (see Users and permissions).
On the left is a list of settings sections. Each of them opens as a separate page. On a narrow screen, the list of sections turns into tabs.
The available sections are:
- Organization and System information: organization details, security and versions (see Organization and System information).
- Workspaces: described in Workspaces.
- Project roles: see Project roles.
- Project statuses: see Project statuses.
- Project health: see Project health.
- Schedule attributes: see Schedule attributes.
- Modules that can be switched on and off: Budget, Risks, Time tracking, Resources, Review, Scoring, Project charters, Products and Strategy (see Switching modules on and off).
- Approvals: see Approval paths.
- Integrations: Jira (see Jira integration), Microsoft Entra ID (see Microsoft Entra ID integration) and Webhooks (see Webhooks).
Organization
The first settings page, Organization, contains these fields:
- The organization logo – the Change avatar and Remove avatar buttons (the maximum file size is 2.5 MB).
- The organization Name – a required field.
- Default system language (see Organization default language).
- Two-factor authentication – Enable / Disable. When on, all users confirm sign-in with a code from an email (see Two-factor authentication).
- Login methods – Password + SSO or SSO only (see Sign-in methods). The field is visible when sign-in through Microsoft or Google is configured in the environment.
Changes are saved immediately, when you leave the field or switch the option.

In a demo organization, the Delete an organisation button is also visible.
Warning: After you click this button and enter the organization name, all its data is permanently deleted, with no possibility of restoring it.
System information
The System information page contains read-only fields:
- API version
- Application version
- Last mongo migration
- File size of the organization (attachments and other stored files, in B, KB, MB or GB)
- License – the number of Full and Standard licenses
- Expiration date of the license
User licenses are assigned in Users and permissions.

Project statuses
A project status describes the stage of a project’s life, for example planning, execution or closing. Statuses are collected on the Project statuses page. A status has the Name and Color fields, and the order of statuses on the list is the same as in the application.
- In the main menu, choose System settings and go to the Project statuses tab.
- Click Add. The Add status window opens.
- Enter the name and choose the color.
- Click Add. FlexiProject adds the status to the list.

To change the name or color, click the status on the list. In the Edit status window, make the changes and click Save.
To change the order of statuses, drag a row by its handle, which appears when you point at the row.
The Delete button in the Edit status window is available when there is more than one status. After you click it, the system asks for a replacement status. After you choose one and confirm the deletion, all projects with the deleted status get the replacement status.
Project statuses are also used in the settings of the Resources module: there you choose the statuses whose work counts towards the workload (see Allocation counting).
Allocation counting
An administrator specifies for the whole organization which projects count towards the workload of people in the Resources in the organization module. This is set in the Allocation counting section on the Resources page of system settings (visible when the Resources module is switched on).
- In the main menu, choose System settings and go to the Resources tab.
- In the Allocation counting section, click Settings. A window with the list of all project statuses opens.
- Switch on the statuses whose projects should count towards the workload.
- Optionally, switch on Include archived projects under Archived projects.
- Click Save. FlexiProject applies the settings when calculating people’s workload.

Projects in statuses that were not ticked can be shown separately in the workload view as Untracked projects (see Organization resource workload). The other module settings are described in Resources module settings.
Switching modules on and off
The Budget, Risks, Time tracking, Resources, Review, Scoring, Project charters, Products and Strategy modules are switched on and off for the whole organization. Use the Enable / Disable switch at the top of the module’s page in system settings. Once a module is on, its further settings are available.
- In the main menu, choose System settings and go to the tab of the chosen module.
- Switch the module to Enable or Disable. The change is saved immediately, and the module’s tabs appear or disappear for all users.

Important: Switching off does not delete data. It hides the module’s tabs and functions from all users, and after you switch the module on again, the data is visible again.
The organizational structure module switches itself on when the organization has at least one department (see Organizational structure).
Organization default language
The Default system language field on the Organization page determines the language that new users of the organization get. Each user can then change their own language in the profile (see User language).
Important: Invitations and names created when copying items are also sent in the default language.
- In the main menu, choose System settings. The Organization page opens.
- Choose a language from the Default system language list. The change is saved immediately, and new users get that language.