Project files

The Files tab gathers all files and links of a project in one place. These are the files added directly on the tab and the attachments added in tasks and milestones, risks, budget items, actuals, products, baselines, reviews and project charters. Each entry shows which item it is attached to.

Files and links can be organized in folders. Each of them can also be attached to a project item without uploading the document again.

The tab is available when Files is ticked in the project menu (gear icon next to the project name), under Functionalities (see Project functionalities), and the user has the Files project permission (see Access to files).

Project templates have their own files tab. A template can therefore carry a ready set of documents for every project created from it (see Files in a template).

The table has these columns:

  • Name,
  • Date (of adding),
  • User (who added it),
  • Association (the items the entry is attached to).

The Filter by name box narrows the list to entries that contain the entered word.

Adding a file, link and folder

Files, links and folders added on this tab belong to the whole project and are at once available as attachments in project items.

  1. In the project, open the Files tab.
  2. Click Add in the upper-right corner and choose an option:
    • File – opens the file picker. You can select several files at once, and each goes on the list as a separate entry,
    • Link – opens the Add attachment window with the URL and Name fields,
    • Folder – opens the Create folder window with the Folder name field.
  3. Confirm the window. The new entry appears in the list.

Project Files tab with the Add button expanded and the options File, Link, Folder; the button and the list of options are highlighted in red

The Add button is visible to users with the Admin permission for files. Others browse the list, open links and download files by clicking the name.

These limits apply:

  • a file can be at most 10 MB,
  • some file types may be blocked in the application configuration (the system displays a message about a forbidden extension),
  • the same link address cannot appear in a project twice.

Folder structure

Folders organize documents in a project, for example by separating contracts from meeting notes. Folders can be nested.

  • To move an entry into a folder, grab it by the handle on the left of the row (visible on hover) and drop it on the folder name.
  • To take an entry out of a folder, drag it to the root level of the list.
  • Folders are moved the same way as files: a new folder is created at the root level, and to nest it, drag it onto another folder.

Important: Moving a file between folders only changes where it is kept on the list. The file stays attached to the same project items.

Users with the Admin permission for files can drag entries.

Attaching a file to an item

When you add an attachment in a project item, you can use a document that is already in the project instead of uploading it again.

  1. Open the item that should get the attachment (for example a task, risk or budget item).
  2. Click the paperclip icon next to the Attachments heading. A list of options opens.
  3. Choose Add existing. A window with the project files and links opens.
  4. Browse the folders, tick the entries you need (you can tick several) and click Save. The chosen files are attached to the item as attachments.

The list of options after clicking the paperclip with the Add existing item

Important: The same file is then visible in both places and counts as one entry on the Files tab.

Important: The Add existing option is visible only to users with the permission to view project files. Adding a new file and a new link is always possible.

The same mechanism works in tasks and milestones, risks, products, budget items, actuals, baselines, project charters and reviews.

Checking where a file is used

The Association column shows, for each entry, the names of the items it is attached to. One entry can be attached to many items, and an entry added directly on the tab does not have to be attached anywhere.

Warning: Removing an attachment from an item deletes the file from the project if it is not attached to any other item. This also applies to files added earlier on the Files tab.

When you click an item name, the application opens the right project tab and the panel of that item. An association with a budget actual is shown as Actual with a date.

The file list with the Association column and project item names

Renaming

Renaming changes the name displayed in the project. For a file, it does not change the name of the downloaded document, and for a link, it does not change the address.

  1. On the Files tab, find the entry.
  2. Open the entry menu (three-dot icon next to the row, visible on hover, or the right mouse button) and choose Rename (for a folder, Rename folder). The Rename file (Rename link) window opens.
  3. Enter the new name and click Save. The new name is displayed in the list.

Rename file window; the Name field and the Save button are highlighted in red

For a file, the window shows the name without the extension. The extension is added back on save, so the file type does not change by accident. For a link, the whole name is edited.

The new name is visible everywhere the entry is attached. The menu is available to users with the Admin permission for files. The file menu also has the Download option.

Deleting

Warning: Deleting removes a file or link from the project and from all items it is attached to. It stops being available as an attachment. This operation cannot be undone.

  1. On the Files tab, find the entry.
  2. Open the entry menu (three-dot icon next to the row) and choose Delete. The system displays a confirmation question.
  3. Read the message, which says whether the entry will be deleted entirely or partially (the rules are described below), and confirm. The system deletes the entry as the message says.

File menu in the project Files tab with the options Download, Rename and Delete; the Delete option is highlighted in red

Some items can no longer be edited, so an attachment cannot be removed from them. This concerns:

  • baselines and project charters with the Awaiting approval, Approved or Rejected status,
  • archived reviews.

The result depends on where the entry is attached:

  • if none of the linked items blocks the operation, the entry is deleted entirely,
  • if only some of the items block it, the entry disappears from the others and stays in the blocked ones. The confirmation button is then called Delete partially, and after the operation the system displays the message: The file was partially deleted. Some links were skipped. (for a link: The link was partially deleted. Some links were skipped.),
  • if all items block it, the entry cannot be deleted. The system displays the The file cannot be deleted (The link cannot be deleted) window saying that the entry is linked only to items that cannot be edited.

Deleting a folder removes all its content, nested folders included. The same three rules apply. If part of the content is attached to items that cannot be edited, the folder stays together with that part (the message The folder was partially deleted. Some content was skipped.). When everything is blocked, the folder stays unchanged.

Users with the Admin permission for files can delete entries.

Access to files

Access to the Files tab depends on the Files project permission, which is set in a user’s permissions in the project or in a project role. It has three levels:

  • No access – the tab is not visible,
  • View – you can browse the list, open links and download files. The Add existing option is visible in project items,
  • Admin – you can also add files, links and folders, and rename, move and delete them.

Important: The permission covers all files and folders of the project. Access cannot be granted to a single file or folder.

The default permissions of a project participant do not include files, so they must be granted separately.

For the rules on deleting files attached to items that can no longer be edited, see Deleting.

For permissions, see Project permissions.