{"id":77054,"date":"2026-10-31T10:00:00","date_gmt":"2026-10-31T09:00:00","guid":{"rendered":"https:\/\/flexi-project.com\/?p=77054"},"modified":"2026-11-02T15:00:20","modified_gmt":"2026-11-02T14:00:20","slug":"solar-power-project-manager","status":"publish","type":"post","link":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/","title":{"rendered":"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.<\/p>\n","protected":false},"author":10,"featured_media":77118,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","footnotes":""},"categories":[655],"tags":[],"post_folder":[],"class_list":["post-77054","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energetika"],"acf":{"ikonka_strony":null,"opis_w_menu":"","nie_pokazuj":false,"sections":[{"acf_fc_layout":"blog_podsumowanie","tresc":"<ul>\n<li><strong>A solar power project manager egy napelemes projekt\u00e9rt felel a mozg\u00f3s\u00edt\u00e1st\u00f3l a COD-ig.<\/strong> A szerep felel\u0151s az \u00fctemterv\u00e9rt, k\u00f6lts\u00e9gvet\u00e9s\u00e9rt, biztons\u00e1g\u00e9rt, min\u0151s\u00e9g\u00e9rt \u00e9s az \u00e9rintettek \u00f6sszehangol\u00e1s\u00e1\u00e9rt egy napelemes telep\u00edt\u00e9sben. K\u00f6zm\u0171l\u00e9tes\u00edtm\u00e9ny\u0171 projektekben ez gyakran 12-24 h\u00f3nap akt\u00edv munk\u00e1t \u00f6lel fel az ind\u00edt\u00e1st\u00f3l a kereskedelmi \u00fczembe helyez\u00e9s d\u00e1tum\u00e1ig.<\/li>\n<li><strong>A szerep elt\u00e9r a telep\u00edt\u00e9si managert\u0151l \u00e9s a superintendentt\u0151l.<\/strong> A project manager a teljes projekt\u00e9rt felel, a telep\u00edt\u00e9si manager a fizikai \u00e9p\u00edt\u00e9s\u00e9rt, a superintendent a napi terepmunk\u00e1t vezeti. Kisebb projektekn\u00e9l egy szem\u00e9ly t\u00f6bb szerepet is viselhet; nagyobbakon ezek k\u00fcl\u00f6n\u00e1ll\u00f3 szerepek, k\u00fcl\u00f6n\u00e1ll\u00f3 felel\u0151ss\u00e9gekkel.<\/li>\n<li><strong>A felel\u0151ss\u00e9gek hat ter\u00fcletet fednek le.<\/strong> \u00dctemterv- \u00e9s k\u00f6lts\u00e9gvet\u00e9s-kezel\u00e9s, beszerz\u00e9si koordin\u00e1ci\u00f3, alv\u00e1llalkoz\u00f3-kezel\u00e9s, biztons\u00e1gi \u00e9s min\u0151s\u00e9gi fel\u00fcgyelet, \u00e9rintett-kommunik\u00e1ci\u00f3 (tulajdonos, hitelez\u0151, k\u00f6zm\u0171, hat\u00f3s\u00e1gok) \u00e9s kock\u00e1zatkezel\u00e9s. A k\u00f6z\u00f6tt\u00fck l\u00e9v\u0151 megfelel\u0151 egyens\u00faly a projekt \u00e9letciklusa sor\u00e1n v\u00e1ltozik.<\/li>\n<li><strong>A javadalmaz\u00e1s t\u00fckr\u00f6zi a tapasztalatot \u00e9s a projekt m\u00e9ret\u00e9t.<\/strong> A bel\u00e9p\u0151 szint\u0171 poz\u00edci\u00f3k 75 000-95 000 USD k\u00f6r\u00fcl kezd\u0151dnek; a k\u00f6z\u00e9pkarrierbeli project managerek 110 000-140 000 USD-t keresnek; a t\u00f6bb k\u00f6zm\u0171l\u00e9tes\u00edtm\u00e9ny\u0171 projektet futtat\u00f3 senior project managerek 160 000-200 000 USD-t vagy t\u00f6bbet \u00e9rhetnek el. A javadalmaz\u00e1s r\u00e9gi\u00f3nk\u00e9nt \u00e9s v\u00e1llalatt\u00edpusonk\u00e9nt (fejleszt\u0151 vs EPC vs tulajdonos k\u00e9pvisel\u0151) v\u00e1ltozik.<\/li>\n<li><strong>A karrier\u00fat a helysz\u00ednt\u0151l a portf\u00f3li\u00f3ig vezet.<\/strong> A legt\u00f6bb napelemes project manager asszisztens PM-k\u00e9nt, m\u00e9rn\u00f6kk\u00e9nt vagy telep\u00edt\u00e9svezet\u0151k\u00e9nt kezdi. Innen el\u0151rel\u00e9pnek f\u00fcggetlen PM, nagyobb projekteket futtat\u00f3 senior PM, t\u00f6bb projektet koordin\u00e1l\u00f3 program manager, \u00e9s v\u00e9g\u00fcl portf\u00f3li\u00f3- vagy oper\u00e1ci\u00f3s szerepekig. A legjobb managerek a technikai m\u00e9lys\u00e9get \u00fczleti \u00e9rz\u00e9kkel \u00f6tv\u00f6zik.<\/li>\n<\/ul>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Mit csin\u00e1l val\u00f3j\u00e1ban egy solar power project manager<\/h2>\n<p>A solar power project manager is the person accountable for delivering a solar generating project on schedule, within budget, and meeting the required performance specifications. The role sits at the intersection of engineering, construction, finance, and stakeholder management. On a utility-scale solar project, the PM leads a project team that may include an installation manager, QA\/QC lead, HSE manager, procurement specialist, and various engineering and support roles.<\/p> A megb\u00edzhat\u00f3 megval\u00f3s\u00edt\u00e1s ugyanazt a fegyelmet ig\u00e9nyli, amelyen a t\u00e1gabb \u00e9rtelemben vett <a href=\"https:\/\/flexi-project.com\/hu\/iparagak\/energiaipar\/\">energiaipari projektmenedzsment<\/a> is nyugszik.<p>The project manager is accountable for the whole project, not just one phase. From the moment the EPC contract is signed through commercial operation date (COD) and warranty handover, the PM is the one person who owns the outcome. This accountability makes the project manager role fundamentally different from more specialized positions like the installation manager (responsible for the physical build) or the superintendent (responsible for daily field work).<\/p><p>The scope varies by employer. A PM working for an EPC contractor focuses on contract delivery: meeting the schedule and budget committed to the owner, managing subcontractors, and resolving issues that threaten delivery. A PM working for a project owner (developer or long-term holder) focuses on project outcomes: ensuring the installed system meets performance expectations and will generate the expected returns over its 25-30 year operating life. A PM working for an independent engineer or lender's representative focuses on verification: checking that the EPC is delivering what was promised. For organizations managing <a href=\"https:\/\/flexi-project.com\/industries\/energy\/solar-farms\/\">solar farms<\/a> at scale, these distinct PM roles must coordinate throughout construction.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Napelemes PM vs telep\u00edt\u00e9si manager vs superintendent: ki mit csin\u00e1l<\/h2>\n<p>These three roles are often confused but are quite distinct in practice. Understanding the differences matters whether you are hiring for one of them, interviewing for one, or trying to understand solar project team structure.<\/p><h3>The project manager<\/h3><p>The <a href=\"https:\/\/flexi-project.com\/hu\/szerepkorok-es-funkciok\/projektmenedzser\/\">project manager<\/a> owns the whole project. They lead planning, run the schedule, manage the budget, coordinate with the owner and lender, handle procurement, oversee quality and safety at a program level, and resolve issues that threaten delivery. The PM typically does not spend most of their time on site; a utility-scale PM might be on site 20-40% of the time, with the balance in offices, meetings, and travel.<\/p><h3>The installation manager<\/h3><p>The installation manager owns the physical build. They lead the on-site team through civil works, mechanical installation, electrical installation, and commissioning. They work closely with crew leads and subcontractors on daily execution. On a project with both roles, the installation manager reports to the project manager and focuses on how work actually gets done; the PM focuses on what gets done, when, and at what cost.<\/p><h3>The superintendent<\/h3><p>The superintendent runs daily field work. They are on site every day the project is active, supervising crews, making tactical decisions about work sequencing, resolving field problems, and keeping work moving. In larger projects there may be multiple superintendents, each responsible for a zone or trade. The superintendent typically reports to the installation manager.<\/p><p>On smaller projects (commercial rooftop, small ground-mount systems), one person may hold all three roles. On large utility-scale projects, they are distinct roles with distinct skills. A good installation manager may not have the business and financial skills to be a good PM; a good PM may not have the hands-on construction expertise to be a good installation manager. Trying to force one person into both roles on a complex project often ends badly for both.<\/p>"},{"acf_fc_layout":"cta","styl":"srodek","motyw":"dark","wybor_klasy_przycisku":"btn_blue","tlo":"bg-clean","uklad_tla":"prostokat","subtytul":"Try FlexiProject!","wyroznione_slowo":"","desc":"Tapasztalja meg a fejlett PPM szoftvert m\u0171k\u00f6d\u00e9s k\u00f6zben, kapjon 30 nap ingyen FlexiProjectet.","zdjecie":null,"pokaz_srodowisko":true,"pokaz_kontakt":false,"glowny_przycisk":"env"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Hat felel\u0151ss\u00e9gi ter\u00fclet<\/h2>\n<h3>Schedule and budget management<\/h3><p>The PM owns the project schedule and budget. They establish the baseline, track performance against it, forecast completion, and manage variances. On a solar project, the schedule structure typically runs 100-500 activities for a utility-scale installation, organized by zone and by trade. The <a href=\"https:\/\/flexi-project.com\/features\/project-schedule\/\">project schedule<\/a> is the backbone of weekly work planning, monthly client reporting, and the trigger for change control decisions.<\/p><h3>Procurement coordination<\/h3><p>Solar projects move large quantities of equipment: modules, inverters, racking, cable, transformers, switchgear. The PM coordinates with the procurement team on specifications, delivery schedules, quality acceptance, and logistics. Equipment arriving too early creates storage and theft risk; equipment arriving too late stops construction. The PM owns the integration between procurement and the construction schedule.<\/p><h3>Subcontractor management<\/h3><p>Most solar EPC projects use subcontractors for civil work, electrical installation, and sometimes mechanical installation. The PM manages the subcontract relationships: contract compliance, performance management, change orders, and payment approvals. Subcontractor underperformance is one of the most common sources of schedule slip on solar projects, and early PM intervention makes the difference between a recoverable problem and a project-threatening one.<\/p><h3>Safety and quality oversight<\/h3><p>While the HSE manager and QA\/QC manager own the day-to-day execution of safety and quality programs, the PM is ultimately accountable. The PM reviews safety reports, reinforces the safety culture, approves QA plans, and is personally involved when incidents occur or quality nonconformities threaten the schedule.<\/p><h3>Stakeholder communication<\/h3><p>The PM is the main point of contact with the project owner, the lender's engineer, the utility, local authorities, and the construction team. Each stakeholder has different information needs and different preferred communication cadences. The PM translates between stakeholders, surfaces issues at the right level of detail, and prevents the most common communication failure: everyone discovering problems only when they become urgent.<\/p><h3>Risk management<\/h3><p>The PM owns the project <a href=\"https:\/\/flexi-project.com\/features\/project-management\/project-risks\/\">risk register<\/a>, drives risk reviews, and ensures that risks are mitigated proactively. Common risks on solar projects include weather delays, equipment delivery slip, subcontractor performance, interconnection delays, environmental compliance issues, and labor availability.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Milyen k\u00e9szs\u00e9gekre van sz\u00fcks\u00e9ge egy solar project managernek<\/h2>\n<p>The skill set spans technical, management, and soft skills. The right balance depends on project scale and employer type, but a strong solar PM has depth in all three areas.<\/p><h3>Technical skills<\/h3><p>A solar PM should understand how a solar generating system works: DC electrical systems, inverters, tracking systems, module characteristics, grid interconnection. They do not need to design the system (engineering lead's job), but they must understand it well enough to evaluate design decisions, interpret test results, and spot problems. For utility-scale projects, additional expertise in civil works (grading, piling, access roads), medium-voltage systems (collection systems, substations), and SCADA\/monitoring is valuable.<\/p><p>Beyond solar-specific knowledge, project management skills matter: scheduling (Primavera, MS Project, or integrated PPM tools), estimating, cost management, change control, Earned Value Management for larger projects, and risk analysis. Industry certifications (PMP, PMI-SP, NABCEP) help but are not mandatory; employers care more about demonstrated project delivery.<\/p><h3>Management skills<\/h3><p>Leading a project team of 20-100 people requires management skills: delegation, performance management, difficult conversations, team development. The PM holds people accountable without destroying motivation, resolves conflicts between team members, and builds a culture where problems surface early rather than being hidden.<\/p><p>Financial literacy matters more than many project managers realize. Reading a construction loan drawdown schedule, understanding the owner's return model, evaluating change order financial impacts, negotiating subcontractor payment terms, all require comfort with financial concepts. PMs who treat the budget as \"the finance team's problem\" rarely rise to senior roles.<\/p><h3>Soft skills<\/h3><p>Communication is critical: writing clearly for project reports, speaking clearly for stakeholder meetings, listening carefully in team meetings and site walks. Negotiation skills matter for subcontractor disputes, change orders, and schedule recovery discussions. The ability to stay calm under pressure, particularly during the commissioning rush at the end of a project, separates good PMs from great ones.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Napi \u00e9s heti ritmus: hogyan t\u00f6lti val\u00f3j\u00e1ban az idej\u00e9t egy napelemes PM<\/h2>\n<p>The actual time allocation varies by project phase, but a typical week during active construction might look like this.<\/p><h3>Field time (20-40%)<\/h3><p>Walking the site with the superintendent to see progress firsthand, checking quality on critical components, meeting with subcontractor leads, participating in safety walks. Field time keeps the PM grounded in reality rather than relying only on reports; good PMs are suspicious of reports that look better than their last site visit suggested.<\/p><h3>Internal meetings (15-25%)<\/h3><p>Project team meetings (weekly review of schedule, budget, risks, issues), subcontractor coordination meetings, procurement updates, engineering reviews when design changes are proposed. Good PMs run tight meetings with clear agendas and action items, rather than open-ended discussions that consume time without resolving issues.<\/p><h3>External meetings (10-20%)<\/h3><p>Owner reviews (typically weekly or biweekly), lender's engineer coordination, utility interface meetings, local authority interactions, community meetings when applicable. These meetings often involve preparation time that is as much work as the meetings themselves.<\/p><h3>Documentation and reporting (15-25%)<\/h3><p>Writing or reviewing weekly reports, updating the schedule, maintaining the risk register, preparing change orders and submittals, approving payment applications. Modern PPM tools that automate standard reports free up time for actual project management; manually assembled reports from spreadsheets eat hours per week that could be better spent elsewhere.<\/p><h3>Problem solving (variable, often 10-25%)<\/h3><p>The buffer that absorbs whatever the project throws at the PM this week: equipment delivery issue, subcontractor dispute, weather delay response, change order negotiation, safety incident. Experienced PMs leave their calendar deliberately underscheduled to absorb these inevitable fires.<\/p>"},{"acf_fc_layout":"cta","styl":"srodek","motyw":"dark","wybor_klasy_przycisku":"btn_blue","tlo":"bg-clean","uklad_tla":"prostokat","subtytul":"Try FlexiProject!","wyroznione_slowo":"","desc":"Fedezze fel a FlexiProject Gantt diagramj\u00e1t, 30 nap ingyen teljes hozz\u00e1f\u00e9r\u00e9ssel!","zdjecie":null,"pokaz_srodowisko":true,"pokaz_kontakt":false,"glowny_przycisk":"env"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Javadalmaz\u00e1s \u00e9s karrierfejl\u0151d\u00e9s<\/h2>\n<p>Compensation for solar project managers varies substantially by region, employer type, and project scale. The figures below are typical ranges for US-based roles as of 2024-2025.<\/p><h3>Entry-level (0-3 years experience)<\/h3><p>Assistant project manager or junior PM roles typically pay $75,000-$95,000 base, with bonus eligibility that may add 10-15%. At this level, roles are usually at smaller EPC firms, in distributed generation (commercial rooftop, small ground-mount), or as part of a project team supporting a senior PM on utility-scale work.<\/p><h3>Mid-career (3-8 years experience)<\/h3><p>Experienced PMs running their own commercial or small utility-scale projects earn $110,000-$140,000 base, often with meaningful bonus (15-25% of base) tied to project performance. At this level, PMs have demonstrated delivery on multiple projects and can run a project largely independently.<\/p><h3>Senior (8+ years experience)<\/h3><p>Senior PMs running utility-scale projects (100+ MW), handling multiple concurrent projects, or working as owner's representatives on major developments typically earn $160,000-$200,000 base, with bonus structures that can double effective compensation for strong performers. At senior developers or well-regarded EPCs, total compensation (base, bonus, equity for executive roles) can reach substantially higher.<\/p><h3>Career progression<\/h3><p>Most solar PMs start as assistant PMs, engineers, or installation leads and progress through independent PM, senior PM, and from there to one of several paths: program manager coordinating multiple related projects, portfolio manager overseeing a developer's project portfolio, operations roles managing operating assets, or executive roles (VP of Construction, COO) at smaller companies. Some PMs transition to independent consulting as owner's engineers or lender's engineers.<\/p><p>The best managers combine technical depth with business acumen. PMs who can speak the language of finance (returns, IRRs, construction loan dynamics) in addition to construction tend to rise faster than those who stay purely in the technical lane. This mix is sometimes framed as the difference between a \"project manager\" and a \"project leader,\" and the distinction becomes sharper at senior levels.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Gyakori hibam\u00f3dok \u00e9s hogyan ker\u00fclik el a j\u00f3 PM-ek \u0151ket<\/h2>\n<p>Several recurring failure modes separate struggling project managers from successful ones. Most relate not to technical gaps but to behavioral patterns.<\/p><p>The <strong>reactive-mode trap<\/strong> catches PMs who spend their days responding to the latest problem rather than driving the project. They become human help desks for subcontractors and crew leads, with their calendar entirely consumed by other people's problems. Good PMs reserve time for proactive work: looking two or three weeks ahead, identifying likely problems, and addressing them before they escalate.<\/p><p>The <strong>status-reporting trap<\/strong> catches PMs who confuse reporting with managing. They produce excellent weekly reports, present polished slides at owner reviews, and generate detailed risk registers, but the project itself drifts. Reporting matters, but the point of reporting is to drive action; a beautiful report on a project that is quietly failing is not a success.<\/p><p>The <strong>subcontractor-trust trap<\/strong> happens when a PM extends full trust to a subcontractor who has not earned it. The PM accepts the subcontractor's reported progress at face value, does not verify quality, and does not catch problems until they are expensive. The fix is \"trust but verify\": take subcontractor reporting seriously, but also walk the site, check the work, and triangulate reported progress against physical reality.<\/p><p>The <strong>technical-tunnel trap<\/strong> catches PMs who were strong engineers before becoming PMs and still identify primarily as technical experts. They solve technical problems well but neglect the management work (schedule, budget, people, stakeholders) because it is less interesting to them. The fix is a conscious shift: the PM's job is to run the project, not to be the best engineer in the room.<\/p><p>The <strong>silent-escalation trap<\/strong> happens when PMs try to handle problems without escalating until the problems are unmanageable. They hope issues will resolve themselves, worry about looking weak if they ask for help, or fear bad news to leadership. The fix is routine escalation of major issues when they are identified rather than when they become crises, with clear ownership of what the PM is handling versus what needs leadership involvement.<\/p><p>Consistent discipline through regular <a href=\"https:\/\/flexi-project.com\/project-reviews\/\">project reviews<\/a> helps PMs catch themselves falling into these traps before they become project-threatening.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Hogyan haszn\u00e1lj\u00e1k a napelemes PM-ek a PPM szoftvert<\/h2>\n<p>Modern solar project management runs on integrated PPM software. The PM's effectiveness often correlates with how well they use the tools their organization provides.<\/p><img alt=\"Project schedule for a photovoltaic farm in the FlexiProject PPM system with phases, owners and progress\" class=\"wp-image-61911 size-large\" height=\"684\" src=\"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/08\/Project-Schedule-for-the-Energy-Industry-in-the-FlexiProject-PPM-System_-1024x684.webp\" width=\"1024\" \/><p><strong>Schedule management<\/strong> is central. A PPM tool that supports Gantt-style scheduling, baseline management, and variance tracking lets the PM see at a glance where the project stands against commitment. Good PMs update the schedule weekly, review it with the superintendent and installation manager, and use it as the primary driver of weekly work planning rather than treating it as a reporting artifact.<\/p><p><strong>Risk registers<\/strong> live in the tool, not in a static spreadsheet. The PM reviews the risk register weekly, updates risk status, tracks mitigation actions to completion, and uses risk discussion as a core part of project reviews. A risk register that was built at project kickoff and never updated is a trailing indicator of PM discipline problems.<\/p><p><strong>Document management and reporting<\/strong> capabilities save significant time. Weekly reports pulled automatically from current project data (schedule status, budget actuals, open risks, safety metrics) take minutes rather than hours to produce. The PM spends the saved time on analysis and action rather than data assembly.<\/p><p><strong>Portfolio visibility<\/strong> matters when the PM is one of several managing projects for the same organization. A view across all active projects helps management identify systemic issues, share lessons learned, and demonstrate consistent delivery discipline. For organizations managing multiple solar projects, this visibility turns individual project knowledge into organizational capability through <a href=\"https:\/\/flexi-project.com\/project-programs\/\">project programs<\/a> that coordinate across teams and sites.<\/p><p><strong>Stakeholder-ready reporting<\/strong> presents project information at the right level for different audiences: detailed enough for the project team, summarized for the owner, structured for the lender's engineer. PMs who can produce this reporting without manual effort each week have an advantage over those who spend half their reporting time formatting.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Hogyan k\u00fcl\u00f6nb\u00f6ztess\u00fck meg az er\u0151s napelemes PM-et a gyeng\u00e9t\u0151l<\/h2>\n<p>Several practical signals distinguish strong solar project managers from weak ones. These signals matter both for people hiring PMs and for PMs who want to grow in the role.<\/p><p><strong>Strong PMs know their numbers.<\/strong> At any point they can tell you where the project stands against schedule and budget, what the most important risks are, and what is on the critical path. Weak PMs give vague answers or need to check a report before answering basic questions about their own project.<\/p><p><strong>Strong PMs surface problems early.<\/strong> Issues come up in weekly reports when they are still small and manageable. Weak PMs let problems grow quietly until they become crises, hoping that something will resolve them before they have to be reported.<\/p><p><strong>Strong PMs run disciplined meetings.<\/strong> Project team meetings start on time, have clear agendas, end with specific action items and owners, and run tight. Weak PMs run meetings that drift, consume more time than they should, and produce unclear outcomes.<\/p><p><strong>Strong PMs partner with their superintendent and installation manager.<\/strong> They respect field expertise, listen to concerns, and treat the field team as equal partners. Weak PMs either micromanage field decisions or stay disconnected from field reality.<\/p><p><strong>Strong PMs communicate up effectively.<\/strong> They give leadership accurate pictures of project status, flag concerns before they become crises, and ask for help when they need it. Weak PMs either hide problems from leadership (hoping they can fix them before anyone notices) or escalate every minor issue (training leadership to tune them out).<\/p><p><strong>Strong PMs learn from their projects.<\/strong> After each project they conduct a candid retrospective, identify what worked and what did not, and apply the lessons to the next project. Weak PMs run the same project the same way regardless of past results, making the same mistakes repeatedly.<\/p>"},{"acf_fc_layout":"faq","tytul":"Gyakran ism\u00e9telt k\u00e9rd\u00e9sek","kategorie":null,"pozycje":[{"pytanie":"Mit csin\u00e1l egy solar power project manager?","odpowiedz":"A solar power project manager felel\u0151s egy napelemes termel\u0151 projekt id\u0151ben, k\u00f6lts\u00e9gvet\u00e9sen bel\u00fcli \u00e9s el\u0151\u00edrt teljes\u00edtm\u00e9nyspecifik\u00e1ci\u00f3nak megfelel\u0151 \u00e1tad\u00e1s\u00e1\u00e9rt. A szerep lefedi az \u00fctemterv- \u00e9s k\u00f6lts\u00e9gvet\u00e9s-kezel\u00e9st, beszerz\u00e9si koordin\u00e1ci\u00f3t, alv\u00e1llalkoz\u00f3-kezel\u00e9st, biztons\u00e1gi \u00e9s min\u0151s\u00e9gi fel\u00fcgyeletet, \u00e9rintett-kommunik\u00e1ci\u00f3t \u00e9s kock\u00e1zatkezel\u00e9st."},{"pytanie":"Miben k\u00fcl\u00f6nb\u00f6zik egy solar project manager a telep\u00edt\u00e9si managert\u0151l?","odpowiedz":"A project manager a teljes projekt\u00e9rt felel (\u00fctemterv, k\u00f6lts\u00e9gvet\u00e9s, \u00e9rintettek, eredm\u00e9ny), m\u00edg a telep\u00edt\u00e9si manager a helysz\u00edni fizikai \u00e9p\u00edt\u00e9s\u00e9rt. Kisebb projektekben egy szem\u00e9ly bet\u00f6ltheti mindk\u00e9t szerepet; k\u00f6zm\u0171l\u00e9tes\u00edtm\u00e9ny\u0171 projektekben k\u00fcl\u00f6n\u00e1ll\u00f3ak."},{"pytanie":"Milyen k\u00e9pes\u00edt\u00e9sek kellenek egy solar power project managernek?","odpowiedz":"A legt\u00f6bb napelemes PM m\u00e9rn\u00f6ki (elektromos, \u00e9p\u00edt\u0151 vagy g\u00e9p\u00e9sz) vagy \u00e9p\u00edt\u00e9smenedzsment alapdiplom\u00e1val rendelkezik, b\u00e1r er\u0151s jel\u00f6ltek m\u00e1s h\u00e1tt\u00e9rb\u0151l is \u00e9rkezhetnek megfelel\u0151 tapasztalattal. Az ipar\u00e1gi tan\u00fas\u00edtv\u00e1nyok (PMP, PMI-SP, NABCEP) seg\u00edtenek, de nem k\u00f6telez\u0151ek."},{"pytanie":"Mennyit keres egy solar power project manager?","odpowiedz":"Az USA-ban a bel\u00e9p\u0151 szint\u0171 napelemes PM-ek jellemz\u0151en 75 000-95 000 USD alapot keresnek, a k\u00f6z\u00e9pkarrierbeli PM-ek 110 000-140 000 USD-t, a k\u00f6zm\u0171l\u00e9tes\u00edtm\u00e9ny\u0171 projekteket futtat\u00f3 senior PM-ek 160 000-200 000 USD-t vagy t\u00f6bbet. A b\u00f3nuszstrukt\u00far\u00e1k 10-25%-ot adnak hozz\u00e1 a k\u00f6z\u00e9pkarrier szinten, \u00e9s l\u00e9nyegesen t\u00f6bbet a senior szinteken."},{"pytanie":"Milyen k\u00e9szs\u00e9gekre van sz\u00fcks\u00e9ge egy sikeres napelemes PM-nek?","odpowiedz":"A technikai k\u00e9szs\u00e9gek (napelemes termel\u0151 rendszerek meg\u00e9rt\u00e9se, projekttervez\u00e9s, k\u00f6lts\u00e9gkezel\u00e9s), vezet\u0151i k\u00e9szs\u00e9gek (csapatvezet\u00e9s, deleg\u00e1l\u00e1s, teljes\u00edtm\u00e9nymenedzsment, p\u00e9nz\u00fcgyi m\u0171velts\u00e9g) \u00e9s soft skillek (kommunik\u00e1ci\u00f3, t\u00e1rgyal\u00e1s, \u00e9rintett-kezel\u00e9s, nyugalom nyom\u00e1s alatt) egyens\u00falya."},{"pytanie":"Milyen eszk\u00f6z\u00f6ket haszn\u00e1lnak a napelemes project managerek?","odpowiedz":"A modern napelemes PM-ek integr\u00e1lt PPM szoftvert haszn\u00e1lnak \u00fctemterv-kezel\u00e9sre, kock\u00e1zatkezel\u00e9sre, jelent\u00e9st\u00e9telre \u00e9s portf\u00f3li\u00f3-l\u00e1that\u00f3s\u00e1gra t\u00f6bb projekten kereszt\u00fcl. A FlexiProject ezeket a k\u00e9pess\u00e9geket k\u00edn\u00e1lja projekt sablonokkal, kock\u00e1zati nyilv\u00e1ntart\u00e1sokkal, portf\u00f3li\u00f3 n\u00e9zetekkel \u00e9s projekt fel\u00fclvizsg\u00e1latokkal."}]}],"hide_all":false,"hide_more":false,"wybor_autora":[2001]},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Solar Power Project Manager: szerep, k\u00e9szs\u00e9gek, fizet\u00e9s<\/title>\n<meta name=\"description\" content=\"Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t\" \/>\n<meta property=\"og:description\" content=\"Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/\" \/>\n<meta property=\"og:site_name\" content=\"FlexiProject\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/FlexiProject\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-31T09:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-02T14:00:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-power-project-manager-1024x572.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"572\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dominik Wrzosek\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Klaudiusz\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/\"},\"author\":{\"name\":\"Dominik Wrzosek\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/person\\\/044e0f4796374a2150016ce18f18503d\"},\"headline\":\"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t\",\"datePublished\":\"2026-10-31T09:00:00+00:00\",\"dateModified\":\"2026-11-02T14:00:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/\"},\"wordCount\":3119,\"publisher\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-power-project-manager-scaled.png\",\"articleSection\":[\"Energetika\"],\"inLanguage\":\"hu\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/\",\"name\":\"Solar Power Project Manager: szerep, k\u00e9szs\u00e9gek, fizet\u00e9s\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-power-project-manager-scaled.png\",\"datePublished\":\"2026-10-31T09:00:00+00:00\",\"dateModified\":\"2026-11-02T14:00:20+00:00\",\"description\":\"Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#breadcrumb\"},\"inLanguage\":\"hu\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#primaryimage\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-power-project-manager-scaled.png\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-power-project-manager-scaled.png\",\"width\":2560,\"height\":1429},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/solar-power-project-manager\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Kezd\u0151lap\",\"item\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/flexiproject-modern-es-atfogo-alkalmazas-a-projekt-es-portfoliomenedzsmenthez\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energetika\",\"item\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/category\\\/energetika\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/\",\"name\":\"FlexiProject\",\"description\":\"Project and porfolio management software | FlexiProject\",\"publisher\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#organization\"},\"alternateName\":\"FlexiProject\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#organization\",\"name\":\"FlexiProject\",\"alternateName\":\"FlexiProject\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/FlexiProject_logo_814px.png\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/FlexiProject_logo_814px.png\",\"width\":982,\"height\":1007,\"caption\":\"FlexiProject\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/FlexiProject\",\"https:\\\/\\\/www.instagram.com\\\/flexiproject\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/flexiproject\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@flexiproject\"],\"description\":\"FlexiProject to kompleksowy program do zarz\u0105dzania projektami i portfelami projekt\u00f3w. Oferuje zespo\u0142om projektowych kompletny zestaw narz\u0119dzi, kt\u00f3re pozwalaj\u0105 zaplanowa\u0107 i skutecznie zrealizowa\u0107 dowolny projekt w organizacji, niezale\u017cnie od rozmiaru czy stopnia zaawansowania.\",\"telephone\":\"+48 22 351 13 82\",\"legalName\":\"FlexiProject Sp. z o.o. Sp.k.\",\"foundingDate\":\"2020-11-26\",\"vatID\":\"5272942612\",\"taxID\":\"387620990\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"},\"ownershipFundingInfo\":\"https:\\\/\\\/flexi-project.com\\\/it\\\/key-strengths\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/person\\\/044e0f4796374a2150016ce18f18503d\",\"name\":\"Dominik Wrzosek\",\"description\":\"Dominik projektmenedzsment szak\u00e9rt\u0151 \u00e9s a Vars\u00f3i M\u0171szaki Egyetem diplom\u00e1sa. \u0150 ir\u00e1ny\u00edtja a FlexiProject rendszer fejleszt\u00e9s\u00e9t, az \u00fczleti ig\u00e9nyeket gyakorlati megold\u00e1sokra ford\u00edtva, amelyek t\u00e1mogatj\u00e1k a projektcsapatokat. Tapasztalata van a FlexiProject k\u00fcl\u00f6nb\u00f6z\u0151 m\u00e9ret\u0171 szervezetekbe t\u00f6rt\u00e9n\u0151 bevezet\u00e9s\u00e9ben, \u00e9s a technikai tud\u00e1st \u00fczleti szeml\u00e9lettel \u00f6tv\u00f6zi a projektek hat\u00e9kony tervez\u00e9se \u00e9s v\u00e9grehajt\u00e1sa \u00e9rdek\u00e9ben.\",\"jobTitle\":\"General Manager at FlexiProject\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/dominik-wrzosek-929425140\\\/\"],\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Dominik-Wrzosek-2.jpg\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Dominik-Wrzosek-2.jpg\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Solar Power Project Manager: szerep, k\u00e9szs\u00e9gek, fizet\u00e9s","description":"Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/","og_locale":"hu_HU","og_type":"article","og_title":"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t","og_description":"Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.","og_url":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/","og_site_name":"FlexiProject","article_publisher":"https:\/\/www.facebook.com\/FlexiProject","article_published_time":"2026-10-31T09:00:00+00:00","article_modified_time":"2026-11-02T14:00:20+00:00","og_image":[{"width":1024,"height":572,"url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-power-project-manager-1024x572.png","type":"image\/png"}],"author":"Dominik Wrzosek","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Klaudiusz"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#article","isPartOf":{"@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/"},"author":{"name":"Dominik Wrzosek","@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/person\/044e0f4796374a2150016ce18f18503d"},"headline":"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t","datePublished":"2026-10-31T09:00:00+00:00","dateModified":"2026-11-02T14:00:20+00:00","mainEntityOfPage":{"@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/"},"wordCount":3119,"publisher":{"@id":"https:\/\/flexi-project.com\/hu\/#organization"},"image":{"@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#primaryimage"},"thumbnailUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-power-project-manager-scaled.png","articleSection":["Energetika"],"inLanguage":"hu"},{"@type":"WebPage","@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/","url":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/","name":"Solar Power Project Manager: szerep, k\u00e9szs\u00e9gek, fizet\u00e9s","isPartOf":{"@id":"https:\/\/flexi-project.com\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#primaryimage"},"image":{"@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#primaryimage"},"thumbnailUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-power-project-manager-scaled.png","datePublished":"2026-10-31T09:00:00+00:00","dateModified":"2026-11-02T14:00:20+00:00","description":"Mit csin\u00e1l egy solar power project manager: felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, napi ritmus, fizet\u00e9s, karrier\u00fat \u00e9s hogyan k\u00fcl\u00f6nb\u00f6znek az er\u0151s PM-ek a gyeng\u00e9kt\u0151l.","breadcrumb":{"@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#breadcrumb"},"inLanguage":"hu","potentialAction":[{"@type":"ReadAction","target":["https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/"]}]},{"@type":"ImageObject","inLanguage":"hu","@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#primaryimage","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-power-project-manager-scaled.png","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-power-project-manager-scaled.png","width":2560,"height":1429},{"@type":"BreadcrumbList","@id":"https:\/\/flexi-project.com\/hu\/solar-power-project-manager\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Kezd\u0151lap","item":"https:\/\/flexi-project.com\/hu\/flexiproject-modern-es-atfogo-alkalmazas-a-projekt-es-portfoliomenedzsmenthez\/"},{"@type":"ListItem","position":2,"name":"Energetika","item":"https:\/\/flexi-project.com\/hu\/category\/energetika\/"},{"@type":"ListItem","position":3,"name":"Solar power project manager: szerep, felel\u0151ss\u00e9gek, k\u00e9szs\u00e9gek, fizet\u00e9s \u00e9s hogyan ismerj\u00fck fel a j\u00f3t"}]},{"@type":"WebSite","@id":"https:\/\/flexi-project.com\/hu\/#website","url":"https:\/\/flexi-project.com\/hu\/","name":"FlexiProject","description":"Project and porfolio management software | FlexiProject","publisher":{"@id":"https:\/\/flexi-project.com\/hu\/#organization"},"alternateName":"FlexiProject","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/flexi-project.com\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu"},{"@type":"Organization","@id":"https:\/\/flexi-project.com\/hu\/#organization","name":"FlexiProject","alternateName":"FlexiProject","url":"https:\/\/flexi-project.com\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu","@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/02\/FlexiProject_logo_814px.png","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/02\/FlexiProject_logo_814px.png","width":982,"height":1007,"caption":"FlexiProject"},"image":{"@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/FlexiProject","https:\/\/www.instagram.com\/flexiproject\/","https:\/\/www.linkedin.com\/company\/flexiproject\/","https:\/\/www.youtube.com\/@flexiproject"],"description":"FlexiProject to kompleksowy program do zarz\u0105dzania projektami i portfelami projekt\u00f3w. Oferuje zespo\u0142om projektowych kompletny zestaw narz\u0119dzi, kt\u00f3re pozwalaj\u0105 zaplanowa\u0107 i skutecznie zrealizowa\u0107 dowolny projekt w organizacji, niezale\u017cnie od rozmiaru czy stopnia zaawansowania.","telephone":"+48 22 351 13 82","legalName":"FlexiProject Sp. z o.o. Sp.k.","foundingDate":"2020-11-26","vatID":"5272942612","taxID":"387620990","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"},"ownershipFundingInfo":"https:\/\/flexi-project.com\/it\/key-strengths\/"},{"@type":"Person","@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/person\/044e0f4796374a2150016ce18f18503d","name":"Dominik Wrzosek","description":"Dominik projektmenedzsment szak\u00e9rt\u0151 \u00e9s a Vars\u00f3i M\u0171szaki Egyetem diplom\u00e1sa. \u0150 ir\u00e1ny\u00edtja a FlexiProject rendszer fejleszt\u00e9s\u00e9t, az \u00fczleti ig\u00e9nyeket gyakorlati megold\u00e1sokra ford\u00edtva, amelyek t\u00e1mogatj\u00e1k a projektcsapatokat. Tapasztalata van a FlexiProject k\u00fcl\u00f6nb\u00f6z\u0151 m\u00e9ret\u0171 szervezetekbe t\u00f6rt\u00e9n\u0151 bevezet\u00e9s\u00e9ben, \u00e9s a technikai tud\u00e1st \u00fczleti szeml\u00e9lettel \u00f6tv\u00f6zi a projektek hat\u00e9kony tervez\u00e9se \u00e9s v\u00e9grehajt\u00e1sa \u00e9rdek\u00e9ben.","jobTitle":"General Manager at FlexiProject","sameAs":["https:\/\/www.linkedin.com\/in\/dominik-wrzosek-929425140\/"],"image":{"@type":"ImageObject","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/03\/Dominik-Wrzosek-2.jpg","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/03\/Dominik-Wrzosek-2.jpg"}}]}},"_links":{"self":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/posts\/77054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/comments?post=77054"}],"version-history":[{"count":0,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/posts\/77054\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/autorzy\/2001"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/media\/77118"}],"wp:attachment":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/media?parent=77054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/categories?post=77054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/tags?post=77054"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/post_folder?post=77054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}