{"id":77044,"date":"2026-10-30T10:00:00","date_gmt":"2026-10-30T09:00:00","guid":{"rendered":"https:\/\/flexi-project.com\/?p=77044"},"modified":"2026-11-02T14:59:45","modified_gmt":"2026-11-02T13:59:45","slug":"department-of-energy-projektmenedzsment","status":"publish","type":"post","link":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/","title":{"rendered":"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.<\/p>\n","protected":false},"author":10,"featured_media":77107,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","footnotes":""},"categories":[655],"tags":[],"post_folder":[],"class_list":["post-77044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energetika"],"acf":{"ikonka_strony":null,"opis_w_menu":"","nie_pokazuj":false,"sections":[{"acf_fc_layout":"blog_podsumowanie","tresc":"<ul>\n<li><strong>Az amerikai Energia\u00fcgyi Miniszt\u00e9rium form\u00e1lis rendelet szerint vezeti a projektmenedzsmentet.<\/strong> DOE Order 413.3B defini\u00e1lja a projektmenedzsment-politik\u00e1t, amely minden DOE t\u0151keeszk\u00f6z-projektet szab\u00e1lyoz, bele\u00e9rtve a napenergia-kutat\u00e1st, t\u00e1rol\u00e1si pilotokat \u00e9s hitelekkel finansz\u00edrozott k\u00f6zm\u0171projekteket. A DOE-val egy\u00fcttm\u0171k\u00f6d\u0151 mag\u00e1nfejleszt\u0151knek saj\u00e1t gyakorlatukat kell igaz\u00edtaniuk annak kapuihoz \u00e9s fel\u00fclvizsg\u00e1lataihoz.<\/li>\n<li><strong>A Critical Decisions (CDs) a DOE \u00e1ltal haszn\u00e1lt kapustrukt\u00fara.<\/strong> A DOE projektek \u00f6t Critical Decision-en haladnak \u00e1t: CD-0 (k\u00fcldet\u00e9si ig\u00e9ny), CD-1 (alternat\u00edva kiv\u00e1laszt\u00e1sa), CD-2 (teljes\u00edtm\u00e9ny alapvonal), CD-3 (\u00e9p\u00edtkez\u00e9s kezdete), CD-4 (projekt befejez\u00e9se). Minden kapunak meghat\u00e1rozott sz\u00e1ll\u00edtand\u00f3i, f\u00fcggetlen fel\u00fclvizsg\u00e1latai \u00e9s form\u00e1lis j\u00f3v\u00e1hagy\u00e1sa van.<\/li>\n<li><strong>A f\u00fcggetlen fel\u00fclvizsg\u00e1lat s\u00falyosabb, mint a mag\u00e1n PM-ben.<\/strong> A DOE projektek Independent Project Reviews (IPRs) \u00e9s Independent Cost Reviews (ICRs) \u00e1tmennek az \u00e9letciklus sor\u00e1n. A DOE-val nem ismer\u0151s fejleszt\u0151k gyakran al\u00e1becs\u00fclik, mennyi id\u0151t vesznek ig\u00e9nybe ezek a fel\u00fclvizsg\u00e1latok \u00e9s milyen m\u00e9lys\u00e9g\u0171 dokument\u00e1ci\u00f3t ig\u00e9nyelnek.<\/li>\n<li><strong>A Loan Programs Office saj\u00e1t PM k\u00f6vetelm\u00e9nyeket t\u00e1maszt.<\/strong> A DOE hitelgaranci\u00e1kat (LPO-n kereszt\u00fcl) el\u00e9r\u0151 napelemes fejleszt\u0151k tov\u00e1bbi projektmenedzsment-k\u00f6vetelm\u00e9nyekkel szembes\u00fclnek az alap DOE 413.3B-n t\u00fal: F\u00fcggetlen M\u00e9rn\u00f6k j\u00f3v\u00e1hagy\u00e1sa, konkr\u00e9t jelent\u00e9st\u00e9teli kadencia \u00e9s hitelszerz\u0151d\u00e9sekhez igaz\u00edtott teljes\u00edtm\u00e9nymonitoroz\u00e1s.<\/li>\n<li><strong>Az igazod\u00e1s megt\u00e9r\u00fcl, a nem igazod\u00e1s dr\u00e1ga.<\/strong> A fejleszt\u0151k, akik bels\u0151 PM folyamataikat \u00fagy \u00e9p\u00edtik fel, hogy anticip\u00e1lj\u00e1k a DOE k\u00f6vetelm\u00e9nyeket, elker\u00fclik az \u00fajramunk\u00e1l\u00e1st, amikor a finansz\u00edroz\u00e1s meg\u00e9rkezik. Azok, akik a DOE-t ut\u00f3lagos gondolatk\u00e9nt kezelik, a dokument\u00e1ci\u00f3 ut\u00f3lagos felszerel\u00e9s\u00e9nek h\u00f3napjaival \u00e9s \u00fctemterv-cs\u00fasz\u00e1ssal szembes\u00fclnek a legrosszabb lehets\u00e9ges pillanatokban.<\/li>\n<\/ul>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Mire utal val\u00f3j\u00e1ban a \"department of energy project management\"<\/h2>\n<p>\"Department of Energy project management\" refers to the project management framework used by the US Department of Energy (DOE) to plan, execute, and oversee the capital asset projects it funds, manages, or finances. For solar developers, this matters because DOE touches the solar industry through multiple channels: research grants administered by the Solar Energy Technologies Office (SETO), loan guarantees issued by the Loan Programs Office (LPO), demonstration project funding, and workforce development programs. Any project that receives DOE funding above specific thresholds must follow DOE project management standards.<\/p> A megb\u00edzhat\u00f3 megval\u00f3s\u00edt\u00e1s ugyanazt a fegyelmet ig\u00e9nyli, amelyen a t\u00e1gabb \u00e9rtelemben vett <a href=\"https:\/\/flexi-project.com\/hu\/iparagak\/energiaipar\/\">energiaipari projektmenedzsment<\/a> is nyugszik.<p>The core document is DOE Order 413.3B (\"Program and Project Management for the Acquisition of Capital Assets\"), supplemented by associated guides and manuals. This policy applies to all DOE capital asset projects at or above a dollar threshold (currently $50 million for the full process, with lighter requirements for smaller projects). It establishes a disciplined project management discipline across the entire DOE project portfolio, from nuclear waste cleanup to accelerator physics to solar energy demonstration.<\/p><p>For developers of utility-scale solar projects that do not receive DOE funding, the direct relevance is limited. But many developers increasingly engage with DOE for one of three reasons: pursuing loan guarantees through LPO (which has supported several major solar deployments), applying for research or demonstration funding through SETO, or participating in DOE-sponsored workforce or technology programs. In each case, understanding DOE's project management expectations helps developers set up their <a href=\"https:\/\/flexi-project.com\/industries\/energy\/solar-farms\/\">solar farm<\/a> project organization to engage effectively.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>DOE Order 413.3B: a DOE projektmenedzsment gerince<\/h2>\n<p>DOE Order 413.3B establishes the project management discipline for all DOE capital asset projects. The order defines responsibilities, project phases, required deliverables, review requirements, and the authority structure for project approval decisions.<\/p><p>Several principles anchor the order. First, projects are managed through a defined lifecycle with distinct phases and formal gates between them. Second, the gate decisions require independent review by qualified reviewers who do not report to the project team. Third, baseline schedule, cost, and scope must be established and maintained with disciplined change control; variances must be investigated and reported. Fourth, risk management is a formal process with documented risk registers and mitigation planning. Fifth, project completion requires formal verification that all deliverables are complete and performance targets achieved.<\/p><p>The order defines different tailoring for different project sizes. Projects above $750 million face the most intensive requirements, including quarterly reviews by senior DOE leadership. Projects between $50 million and $750 million face standard requirements. Projects below $50 million can use streamlined approaches tailored to project characteristics. For solar developers engaging with DOE at the demonstration or loan-financed utility scale, understanding which tier the project falls into is the first step in understanding what will be required.<\/p><p>The order is supplemented by a series of DOE Guides (G413.3-series) that provide more detailed guidance on specific topics: contract performance management (G413.3-5), risk management (G413.3-7), earned value management (G413.3-10), and others. Developers whose projects fall under DOE 413.3B typically need working familiarity with multiple of these guides.<\/p>"},{"acf_fc_layout":"cta","styl":"srodek","motyw":"dark","wybor_klasy_przycisku":"btn_blue","tlo":"bg-clean","uklad_tla":"prostokat","subtytul":"Try FlexiProject!","wyroznione_slowo":"","desc":"Tapasztalja meg a k\u00f6vetkez\u0151 szint\u0171 projektir\u00e1ny\u00edt\u00e1st fejlett PPM szoftverrel, kezdje ingyen m\u00e9g ma.","zdjecie":null,"pokaz_srodowisko":true,"pokaz_kontakt":false,"glowny_przycisk":"env"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Critical Decisions: az \u00f6t kapu strukt\u00far\u00e1ja<\/h2>\n<p>DOE projects move through five Critical Decisions (CDs), each a formal gate where senior DOE leadership approves the project to proceed to the next phase. The gate structure differs significantly from the lighter stage-gate processes common in private solar development.<\/p><p><strong>CD-0: Approve Mission Need.<\/strong> This is the earliest gate, authorizing DOE to begin considering a project to meet a specific mission need. The deliverable is a Mission Need Statement that describes the need, estimates the potential cost range, and proposes a preliminary schedule. For solar projects, CD-0 might authorize work on a specific demonstration project supporting SETO objectives or a technology deployment addressing a specific grid reliability issue.<\/p><p><strong>CD-1: Approve Alternative Selection and Cost Range.<\/strong> Between CD-0 and CD-1, the project team evaluates alternatives for meeting the mission need, develops preliminary engineering, estimates cost and schedule ranges, and conducts initial environmental review. CD-1 approves a specific project alternative and authorizes continued development.<\/p><p><strong>CD-2: Approve Performance Baseline.<\/strong> This is the key commitment gate. The project establishes a performance baseline (scope, schedule, cost, risks, performance measures) that becomes the formal commitment DOE makes to Congress. The baseline is subject to Earned Value Management (EVM) reporting and change control. For solar demonstrations and major deployments, CD-2 represents the point at which detailed engineering, procurement planning, and construction preparation can accelerate.<\/p><p><strong>CD-3: Approve Start of Construction.<\/strong> CD-3 authorizes construction start. By this point, final design should be substantially complete, major equipment orders placed or committed, construction contractors selected, and all permits in place. The gate confirms readiness to execute the physical build.<\/p><p><strong>CD-4: Approve Project Completion.<\/strong> CD-4 is the formal closeout gate. Construction is complete, performance testing has demonstrated the project meets its baseline performance targets, and the project is ready for operations handover. For solar projects, CD-4 corresponds roughly to COD plus a performance validation period. Each gate's success depends on disciplined project management against the <a href=\"https:\/\/flexi-project.com\/features\/project-schedule\/\">project schedule<\/a> and performance baseline.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>F\u00fcggetlen fel\u00fclvizsg\u00e1latok: Independent Project Reviews \u00e9s Cost Reviews<\/h2>\n<p>DOE projects undergo multiple layers of independent review beyond what private developers typically encounter. Understanding these reviews early helps developers plan documentation and schedule accordingly.<\/p><h3>Independent Project Reviews (IPRs)<\/h3><p>IPRs are periodic reviews by qualified reviewers who are independent of the project team. For large projects, IPRs occur at each CD gate and at specified intervals during execution (typically annually, sometimes more frequently for troubled projects). The IPR team examines schedule performance, cost performance, risk management, technical approach, management structure, and overall project health. Reports go to senior DOE leadership and often influence CD approval decisions.<\/p><h3>Independent Cost Reviews (ICRs) and Independent Cost Estimates (ICEs)<\/h3><p>ICRs validate the project's cost estimates and baselines through independent analysis. For CD-1 and CD-2 reviews, an ICE provides a parallel estimate that DOE compares against the project team's estimate. Divergence between the project estimate and the ICE often triggers additional analysis or baseline adjustments before CD approval.<\/p><h3>External Independent Reviews (EIRs)<\/h3><p>For the largest projects (above $750 million) or projects experiencing significant performance issues, EIRs bring in reviewers from outside DOE entirely, often retired executives from major capital project organizations. EIRs typically run deeper and longer than IPRs and may recommend substantial restructuring.<\/p><p>The practical implication for solar developers is that DOE-funded or DOE-financed projects require documentation sufficient to withstand external scrutiny by reviewers who did not help build the plan. A <a href=\"https:\/\/flexi-project.com\/features\/project-management\/project-risks\/\">risk register<\/a> that is adequate for internal project management may need significant hardening to serve as evidence in an IPR. Project teams working with DOE for the first time often underestimate the time this documentation requires.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Loan Programs Office \u00e9s napelemes projektmenedzsment<\/h2>\n<p>For solar developers, the DOE Loan Programs Office (LPO) is often the most direct engagement with DOE project management requirements. LPO has supported major solar deployments through its loan guarantee programs, enabling projects to access long-term debt at favorable rates. In exchange, borrowers accept specific project management obligations beyond the basic DOE 413.3B framework.<\/p><p>LPO's project management requirements emphasize independent verification throughout the project lifecycle. The borrower engages an Independent Engineer (IE) acceptable to LPO. The IE reviews design, construction progress, and commissioning against lender requirements. IE sign-off is required at specific milestones, including notice to proceed, major equipment deliveries, mechanical completion, and commercial operation. Borrower projects where IE sign-off is delayed cannot draw on construction loan funds for affected scope.<\/p><p>Reporting requirements are specific and demanding. Monthly construction progress reports, quarterly operating performance reports once operational, annual compliance certifications, and ad-hoc reports when material issues arise. The reports follow LPO-specified formats and provide the data LPO uses to monitor loan performance across its portfolio. Developers who have worked only in private debt markets often find the reporting cadence significantly heavier than they anticipated.<\/p><p>Operating performance monitoring continues through the loan term, which can run 20-30 years for solar projects. The project must maintain performance ratios aligned with loan covenants; underperformance triggers covenant reviews and potential acceleration provisions. Project management does not end at COD for LPO-financed projects; it continues through operations in a form adapted to the operating phase. The relevant principles here apply equally in broader <a href=\"https:\/\/flexi-project.com\/industries\/energy\/energy-storage\/\">energy storage<\/a> and generation projects supported by LPO.<\/p>"},{"acf_fc_layout":"cta","styl":"srodek","motyw":"dark","wybor_klasy_przycisku":"btn_blue","tlo":"bg-clean","uklad_tla":"prostokat","subtytul":"Try FlexiProject!","wyroznione_slowo":"","desc":"Kapcsolja \u00f6ssze a strat\u00e9gi\u00e1t a projektv\u00e9grehajt\u00e1ssal, pr\u00f3b\u00e1lja ki a FlexiProjectet ingyen 30 napig.","zdjecie":null,"pokaz_srodowisko":true,"pokaz_kontakt":false,"glowny_przycisk":"env"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>SETO finansz\u00edroz\u00e1s \u00e9s kutat\u00e1si projektmenedzsment<\/h2>\n<p>The Solar Energy Technologies Office (SETO) is DOE's primary vehicle for solar research, development, and demonstration funding. SETO's project management expectations differ from LPO's but share the emphasis on disciplined execution against defined baselines.<\/p><p>SETO-funded projects typically run through cooperative agreements or grants with universities, national labs, industry consortia, or private companies. Each award carries specific project management requirements: approved project plan, defined milestones with deliverables and quarterly reporting, go\/no-go decisions at specified points, and final technical and financial reports. SETO program managers monitor progress and have authority to redirect funding, modify scope, or terminate underperforming projects.<\/p><p>For technology demonstration projects, the project management structure resembles capital construction more closely. These projects may build pilot-scale solar deployments to demonstrate specific technologies (bifacial modules, agrivoltaics configurations, advanced tracking systems, hybrid solar-storage integrations). The project management expectations include engineering review, construction oversight, performance testing, and dissemination of results through conference papers and journal publications.<\/p><p>SETO places particular emphasis on go\/no-go decision points. These are explicit decision points where project continuation is contingent on meeting specific technical or performance milestones. A project that does not meet its go\/no-go criteria is not automatically terminated, but continuation requires additional review and justification. The go\/no-go structure drives project teams to focus on the critical technical risks rather than deferring hard decisions to later phases.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Mit jelent ez a mag\u00e1n napelemes fejleszt\u0151knek<\/h2>\n<p>Private solar developers who do not take DOE funding may still care about DOE project management for several practical reasons.<\/p><p>First, DOE PM standards influence industry best practices broadly. Methodologies developed for DOE projects migrate into private sector practice, especially among engineering and construction firms that work on both DOE and private solar projects. Developers who follow DOE-inspired practices often find their project documentation and processes more credible to lenders, insurers, and partners.<\/p><p>Second, DOE loan guarantees are an attractive financing option for certain project types (large utility-scale, novel technologies, first-of-a-kind deployments). Developers who are not currently pursuing LPO funding may do so in the future, and projects designed from the start with LPO requirements in mind are easier to finance when the time comes.<\/p><p>Third, workforce and technology mobility means that solar project teams increasingly include people with DOE experience. Developers who understand DOE's PM vocabulary can more effectively integrate these people into their own project organizations and benefit from the discipline they bring. The DOE emphasis on <a href=\"https:\/\/flexi-project.com\/features\/project-management\/project-risks\/\">risk management<\/a>, independent review, and documented decision rationale translates well to private sector best practice.<\/p><p>Fourth, demonstration and research projects supported by DOE often validate technologies that private developers later deploy commercially. Understanding the project management structures of these demonstrations helps developers interpret results and apply lessons learned appropriately.<\/p><p>For organizations managing multiple solar projects with varied funding sources, including DOE, a consistent <a href=\"https:\/\/flexi-project.com\/project-templates\/\">project template<\/a> structure that can accommodate both private and DOE requirements saves significant effort and reduces errors.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Gyakori buktat\u00f3k a DOE-hoz kapcsol\u00f3d\u00f3 napelemes projektmenedzsmentben<\/h2>\n<p>Several pitfalls recur when private solar developers engage with DOE project management requirements. Recognizing them early prevents painful rework.<\/p><p>The <strong>documentation underestimation pitfall<\/strong> is the most common. DOE requires documentation that is both specific (addressing defined topics in defined formats) and sufficient (providing the depth that independent reviewers can validate). Teams accustomed to private sector documentation often underestimate how much more DOE requires. The practical fix is early engagement with experienced DOE PM consultants or hires who have worked on prior DOE projects.<\/p><p>The <strong>schedule optimism pitfall<\/strong> treats DOE review timelines as similar to private sector reviews. In reality, CD gate reviews, IPRs, and IE sign-offs can each take weeks or months. Projects that assume quick approvals and fail to build adequate review time into the schedule find themselves perpetually behind. The fix is honest schedule planning that treats DOE review cycles as the significant commitments they are.<\/p><p>The <strong>communication-silo pitfall<\/strong> happens when the project team manages the DOE relationship as a separate workstream from technical execution. This fragments decision-making and often means that technical choices are made without considering DOE implications. The fix is integrated project management with DOE requirements visible to all project team members at all times.<\/p><p>The <strong>baseline-stickiness pitfall<\/strong> happens when teams establish an initial baseline at CD-2 and then struggle to update it as reality diverges. DOE change control processes exist to accommodate justified changes, but they must be used proactively. Teams that avoid change control to \"protect\" the baseline create larger problems when reality catches up.<\/p><p>The <strong>handover pitfall<\/strong> happens when the construction team completes the project but documentation for operations handover (particularly for LPO-financed projects moving to long-term operations) is incomplete. This can delay COD and trigger loan covenant issues. The fix is treating handover documentation as a construction deliverable, not a post-construction cleanup. A disciplined <a href=\"https:\/\/flexi-project.com\/project-reviews\/\">project review<\/a> process throughout construction keeps handover visible as a project objective.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>PPM szoftver haszn\u00e1lata DOE k\u00f6vetelm\u00e9nyekhez val\u00f3 igaz\u00edt\u00e1shoz<\/h2>\n<p>Modern PPM software offers several capabilities that help solar project teams align with DOE project management expectations.<\/p><img alt=\"\" class=\"wp-image-43500 size-large\" height=\"680\" src=\"https:\/\/flexi-project.com\/wp-content\/uploads\/2025\/08\/Initial-baseline-in-FlexiProject-1024x680.png\" width=\"1024\" \/><p><strong>Formal stage-gate support<\/strong> matches the DOE CD structure. A PPM tool that treats gates as first-class objects, with defined entry criteria, deliverables, and exit decisions, maps directly to DOE's five CDs. Teams can see at a glance which gate each project is approaching, what the gate requires, and what has been completed. This visibility helps project teams prepare for CDs and helps management track portfolio progress through DOE gates.<\/p><p><strong>Baseline management and change control<\/strong> is central to DOE compliance. The PPM tool must support formal baselines (scope, schedule, cost, performance), track variances against baseline, and record change control decisions. For projects subject to Earned Value Management reporting, the tool must support EVM calculations and reporting formats.<\/p><p><strong>Risk register and risk reporting<\/strong> aligned with DOE expectations is essential. The risk register must capture risks with probability, impact, mitigation plans, owners, and status. Risk reporting to IPRs, DOE program offices, and the Independent Engineer requires specific formats and depth that generic tools often cannot produce without manual effort.<\/p><p><strong>Portfolio reporting<\/strong> matters for organizations managing multiple DOE-adjacent projects. Portfolio-level views across projects help identify systemic issues, share lessons learned, and demonstrate consistent project management discipline to DOE evaluators. Capabilities that extend into <a href=\"https:\/\/flexi-project.com\/industries\/energy\/energy-storage\/\">energy storage portfolio management<\/a> and across the generation mix matter particularly for developers whose DOE engagement spans multiple technologies.<\/p><p><strong>Audit trail and documentation<\/strong> capabilities help prepare for independent reviews. A PPM tool that automatically maintains an audit trail of baseline changes, risk status updates, schedule revisions, and decision rationale provides evidence that reviewers can validate without reconstruction from scratch.<\/p>"},{"acf_fc_layout":"faq","tytul":"Gyakran ism\u00e9telt k\u00e9rd\u00e9sek","kategorie":null,"pozycje":[{"pytanie":"Mi az a DOE Order 413.3B?","odpowiedz":"A DOE Order 413.3B ('Program and Project Management for the Acquisition of Capital Assets') az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsment-politik\u00e1ja minden t\u0151keeszk\u00f6z-projektre. Meghat\u00e1rozza a projektf\u00e1zisokat, Critical Decision kapukat, f\u00fcggetlen fel\u00fclvizsg\u00e1lati k\u00f6vetelm\u00e9nyeket, alapvonal-kezel\u00e9st, v\u00e1ltoz\u00e1skezel\u00e9st, kock\u00e1zatkezel\u00e9st \u00e9s megszerzett \u00e9rt\u00e9k jelent\u00e9st\u00e9telt."},{"pytanie":"Mik azok a DOE Critical Decisions?","odpowiedz":"A Critical Decisions (CDs) az \u00f6t form\u00e1lis kapu, amelyen a DOE projektek \u00e1thaladnak: CD-0 (k\u00fcldet\u00e9si ig\u00e9ny j\u00f3v\u00e1hagy\u00e1sa), CD-1 (alternat\u00edva kiv\u00e1laszt\u00e1s \u00e9s k\u00f6lts\u00e9gtartom\u00e1ny j\u00f3v\u00e1hagy\u00e1sa), CD-2 (teljes\u00edtm\u00e9ny alapvonal j\u00f3v\u00e1hagy\u00e1sa), CD-3 (\u00e9p\u00edtkez\u00e9s kezdet\u00e9nek j\u00f3v\u00e1hagy\u00e1sa) \u00e9s CD-4 (projekt befejez\u00e9s\u00e9nek j\u00f3v\u00e1hagy\u00e1sa). Minden kapu konkr\u00e9t sz\u00e1ll\u00edtand\u00f3kat, f\u00fcggetlen fel\u00fclvizsg\u00e1latot \u00e9s a vezet\u0151 DOE vezet\u00e9s j\u00f3v\u00e1hagy\u00e1s\u00e1t ig\u00e9nyli."},{"pytanie":"Vonatkozik a DOE Order 413.3B mag\u00e1n napelemes fejleszt\u0151kre?","odpowiedz":"K\u00f6zvetlen\u00fcl vonatkozik, amikor a fejleszt\u0151k DOE finansz\u00edroz\u00e1st vagy hitelt kapnak meghat\u00e1rozott k\u00fcsz\u00f6b\u00f6k felett, bele\u00e9rtve SETO t\u00e1mogat\u00e1sokon vagy LPO hitelgaranci\u00e1kon kereszt\u00fcl. Mag\u00e1nfinansz\u00edroz\u00e1s\u00fa projektekre DOE bevon\u00e1sa n\u00e9lk\u00fcl a DOE 413.3B k\u00f6zvetlen\u00fcl nem vonatkozik, b\u00e1r sok elve a legjobb ipar\u00e1gi gyakorlatokat k\u00e9pviseli."},{"pytanie":"Mit k\u00f6vetel a DOE Loan Programs Office a hitelfelvev\u0151kt\u0151l?","odpowiedz":"Az LPO hitelfelvev\u0151knek LPO sz\u00e1m\u00e1ra elfogadhat\u00f3 F\u00fcggetlen M\u00e9rn\u00f6k\u00f6t kell szerz\u0151dtetni\u00fck. Havi \u00e9p\u00edtkez\u00e9si el\u0151rehalad\u00e1si jelent\u00e9sek, negyed\u00e9ves m\u0171k\u00f6d\u00e9si teljes\u00edtm\u00e9nyjelent\u00e9sek, \u00e9ves megfelel\u0151s\u00e9gi tan\u00fas\u00edtv\u00e1nyok \u00e9s ad-hoc jelent\u00e9sek szabv\u00e1nyosak. A m\u0171k\u00f6d\u00e9si teljes\u00edtm\u00e9nymonitoroz\u00e1s a hitel futamideje alatt folytat\u00f3dik (potenci\u00e1lisan 20-30 \u00e9v)."},{"pytanie":"Mi a k\u00fcl\u00f6nbs\u00e9g a DOE PM \u00e9s a mag\u00e1n napelemes PM k\u00f6z\u00f6tt?","odpowiedz":"A DOE PM l\u00e9nyegesen form\u00e1lisabb, nehezebb dokument\u00e1ci\u00f3s k\u00f6vetelm\u00e9nyekkel, t\u00f6bb ponton f\u00fcggetlen fel\u00fclvizsg\u00e1lattal, form\u00e1lis kapuj\u00f3v\u00e1hagy\u00e1sokkal a DOE vezet\u0151 vezet\u00e9s \u00e1ltal \u00e9s szigor\u00fa v\u00e1ltoz\u00e1skontrollal az alapvonalak ellen. A mag\u00e1n napelemes PM jellemz\u0151en k\u00f6nnyebb."},{"pytanie":"Milyen eszk\u00f6z\u00f6k seg\u00edtenek a DOE-hoz kapcsol\u00f3d\u00f3 napelemes projektek kezel\u00e9s\u00e9ben?","odpowiedz":"PPM szoftver form\u00e1lis stage-gate t\u00e1mogat\u00e1ssal, alapvonal-kezel\u00e9ssel, v\u00e1ltoz\u00e1skontrollal, kock\u00e1zati nyilv\u00e1ntart\u00e1sokkal, portf\u00f3li\u00f3 n\u00e9zetekkel \u00e9s auditnapl\u00f3val. A FlexiProject ezeket a k\u00e9pess\u00e9geket k\u00edn\u00e1lja projekt sablonokkal, Gantt-\u00fctemez\u00e9ssel, kock\u00e1zatkezel\u00e9ssel, projekt fel\u00fclvizsg\u00e1latokkal \u00e9s programn\u00e9zetekkel."}]}],"hide_all":false,"hide_more":false,"wybor_autora":[2001]},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Department of Energy projektmenedzsment: DOE \u00fatmutat\u00f3<\/title>\n<meta name=\"description\" content=\"\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek\" \/>\n<meta property=\"og:description\" content=\"\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/\" \/>\n<meta property=\"og:site_name\" content=\"FlexiProject\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/FlexiProject\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T09:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-02T13:59:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/department-of-energy-project-management-1024x572.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"572\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dominik Wrzosek\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Klaudiusz\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/\"},\"author\":{\"name\":\"Dominik Wrzosek\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/person\\\/044e0f4796374a2150016ce18f18503d\"},\"headline\":\"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek\",\"datePublished\":\"2026-10-30T09:00:00+00:00\",\"dateModified\":\"2026-11-02T13:59:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/\"},\"wordCount\":2784,\"publisher\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/department-of-energy-project-management-scaled.png\",\"articleSection\":[\"Energetika\"],\"inLanguage\":\"hu\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/\",\"name\":\"Department of Energy projektmenedzsment: DOE \u00fatmutat\u00f3\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/department-of-energy-project-management-scaled.png\",\"datePublished\":\"2026-10-30T09:00:00+00:00\",\"dateModified\":\"2026-11-02T13:59:45+00:00\",\"description\":\"\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#breadcrumb\"},\"inLanguage\":\"hu\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#primaryimage\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/department-of-energy-project-management-scaled.png\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/department-of-energy-project-management-scaled.png\",\"width\":2560,\"height\":1429},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/department-of-energy-projektmenedzsment\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Kezd\u0151lap\",\"item\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/flexiproject-modern-es-atfogo-alkalmazas-a-projekt-es-portfoliomenedzsmenthez\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energetika\",\"item\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/category\\\/energetika\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/\",\"name\":\"FlexiProject\",\"description\":\"Project and porfolio management software | FlexiProject\",\"publisher\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#organization\"},\"alternateName\":\"FlexiProject\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#organization\",\"name\":\"FlexiProject\",\"alternateName\":\"FlexiProject\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/FlexiProject_logo_814px.png\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/FlexiProject_logo_814px.png\",\"width\":982,\"height\":1007,\"caption\":\"FlexiProject\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/FlexiProject\",\"https:\\\/\\\/www.instagram.com\\\/flexiproject\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/flexiproject\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@flexiproject\"],\"description\":\"FlexiProject to kompleksowy program do zarz\u0105dzania projektami i portfelami projekt\u00f3w. Oferuje zespo\u0142om projektowych kompletny zestaw narz\u0119dzi, kt\u00f3re pozwalaj\u0105 zaplanowa\u0107 i skutecznie zrealizowa\u0107 dowolny projekt w organizacji, niezale\u017cnie od rozmiaru czy stopnia zaawansowania.\",\"telephone\":\"+48 22 351 13 82\",\"legalName\":\"FlexiProject Sp. z o.o. Sp.k.\",\"foundingDate\":\"2020-11-26\",\"vatID\":\"5272942612\",\"taxID\":\"387620990\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"},\"ownershipFundingInfo\":\"https:\\\/\\\/flexi-project.com\\\/it\\\/key-strengths\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/hu\\\/#\\\/schema\\\/person\\\/044e0f4796374a2150016ce18f18503d\",\"name\":\"Dominik Wrzosek\",\"description\":\"Dominik projektmenedzsment szak\u00e9rt\u0151 \u00e9s a Vars\u00f3i M\u0171szaki Egyetem diplom\u00e1sa. \u0150 ir\u00e1ny\u00edtja a FlexiProject rendszer fejleszt\u00e9s\u00e9t, az \u00fczleti ig\u00e9nyeket gyakorlati megold\u00e1sokra ford\u00edtva, amelyek t\u00e1mogatj\u00e1k a projektcsapatokat. Tapasztalata van a FlexiProject k\u00fcl\u00f6nb\u00f6z\u0151 m\u00e9ret\u0171 szervezetekbe t\u00f6rt\u00e9n\u0151 bevezet\u00e9s\u00e9ben, \u00e9s a technikai tud\u00e1st \u00fczleti szeml\u00e9lettel \u00f6tv\u00f6zi a projektek hat\u00e9kony tervez\u00e9se \u00e9s v\u00e9grehajt\u00e1sa \u00e9rdek\u00e9ben.\",\"jobTitle\":\"General Manager at FlexiProject\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/dominik-wrzosek-929425140\\\/\"],\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Dominik-Wrzosek-2.jpg\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Dominik-Wrzosek-2.jpg\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Department of Energy projektmenedzsment: DOE \u00fatmutat\u00f3","description":"\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/","og_locale":"hu_HU","og_type":"article","og_title":"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek","og_description":"\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.","og_url":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/","og_site_name":"FlexiProject","article_publisher":"https:\/\/www.facebook.com\/FlexiProject","article_published_time":"2026-10-30T09:00:00+00:00","article_modified_time":"2026-11-02T13:59:45+00:00","og_image":[{"width":1024,"height":572,"url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/department-of-energy-project-management-1024x572.png","type":"image\/png"}],"author":"Dominik Wrzosek","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Klaudiusz"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#article","isPartOf":{"@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/"},"author":{"name":"Dominik Wrzosek","@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/person\/044e0f4796374a2150016ce18f18503d"},"headline":"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek","datePublished":"2026-10-30T09:00:00+00:00","dateModified":"2026-11-02T13:59:45+00:00","mainEntityOfPage":{"@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/"},"wordCount":2784,"publisher":{"@id":"https:\/\/flexi-project.com\/hu\/#organization"},"image":{"@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#primaryimage"},"thumbnailUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/department-of-energy-project-management-scaled.png","articleSection":["Energetika"],"inLanguage":"hu"},{"@type":"WebPage","@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/","url":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/","name":"Department of Energy projektmenedzsment: DOE \u00fatmutat\u00f3","isPartOf":{"@id":"https:\/\/flexi-project.com\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#primaryimage"},"image":{"@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#primaryimage"},"thumbnailUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/department-of-energy-project-management-scaled.png","datePublished":"2026-10-30T09:00:00+00:00","dateModified":"2026-11-02T13:59:45+00:00","description":"\u00datmutat\u00f3 az amerikai Energia\u00fcgyi Miniszt\u00e9rium projektmenedzsmentj\u00e9hez napelemes fejleszt\u0151knek: DOE Order 413.3B, Critical Decisions, LPO, SETO \u00e9s mag\u00e1nszektorbeli vonatkoz\u00e1sok.","breadcrumb":{"@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#breadcrumb"},"inLanguage":"hu","potentialAction":[{"@type":"ReadAction","target":["https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/"]}]},{"@type":"ImageObject","inLanguage":"hu","@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#primaryimage","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/department-of-energy-project-management-scaled.png","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/department-of-energy-project-management-scaled.png","width":2560,"height":1429},{"@type":"BreadcrumbList","@id":"https:\/\/flexi-project.com\/hu\/department-of-energy-projektmenedzsment\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Kezd\u0151lap","item":"https:\/\/flexi-project.com\/hu\/flexiproject-modern-es-atfogo-alkalmazas-a-projekt-es-portfoliomenedzsmenthez\/"},{"@type":"ListItem","position":2,"name":"Energetika","item":"https:\/\/flexi-project.com\/hu\/category\/energetika\/"},{"@type":"ListItem","position":3,"name":"Department of Energy projektmenedzsment: \u00fatmutat\u00f3 a DOE kerethez napelemes fejleszt\u0151knek"}]},{"@type":"WebSite","@id":"https:\/\/flexi-project.com\/hu\/#website","url":"https:\/\/flexi-project.com\/hu\/","name":"FlexiProject","description":"Project and porfolio management software | FlexiProject","publisher":{"@id":"https:\/\/flexi-project.com\/hu\/#organization"},"alternateName":"FlexiProject","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/flexi-project.com\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu"},{"@type":"Organization","@id":"https:\/\/flexi-project.com\/hu\/#organization","name":"FlexiProject","alternateName":"FlexiProject","url":"https:\/\/flexi-project.com\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu","@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/02\/FlexiProject_logo_814px.png","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/02\/FlexiProject_logo_814px.png","width":982,"height":1007,"caption":"FlexiProject"},"image":{"@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/FlexiProject","https:\/\/www.instagram.com\/flexiproject\/","https:\/\/www.linkedin.com\/company\/flexiproject\/","https:\/\/www.youtube.com\/@flexiproject"],"description":"FlexiProject to kompleksowy program do zarz\u0105dzania projektami i portfelami projekt\u00f3w. Oferuje zespo\u0142om projektowych kompletny zestaw narz\u0119dzi, kt\u00f3re pozwalaj\u0105 zaplanowa\u0107 i skutecznie zrealizowa\u0107 dowolny projekt w organizacji, niezale\u017cnie od rozmiaru czy stopnia zaawansowania.","telephone":"+48 22 351 13 82","legalName":"FlexiProject Sp. z o.o. Sp.k.","foundingDate":"2020-11-26","vatID":"5272942612","taxID":"387620990","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"},"ownershipFundingInfo":"https:\/\/flexi-project.com\/it\/key-strengths\/"},{"@type":"Person","@id":"https:\/\/flexi-project.com\/hu\/#\/schema\/person\/044e0f4796374a2150016ce18f18503d","name":"Dominik Wrzosek","description":"Dominik projektmenedzsment szak\u00e9rt\u0151 \u00e9s a Vars\u00f3i M\u0171szaki Egyetem diplom\u00e1sa. \u0150 ir\u00e1ny\u00edtja a FlexiProject rendszer fejleszt\u00e9s\u00e9t, az \u00fczleti ig\u00e9nyeket gyakorlati megold\u00e1sokra ford\u00edtva, amelyek t\u00e1mogatj\u00e1k a projektcsapatokat. Tapasztalata van a FlexiProject k\u00fcl\u00f6nb\u00f6z\u0151 m\u00e9ret\u0171 szervezetekbe t\u00f6rt\u00e9n\u0151 bevezet\u00e9s\u00e9ben, \u00e9s a technikai tud\u00e1st \u00fczleti szeml\u00e9lettel \u00f6tv\u00f6zi a projektek hat\u00e9kony tervez\u00e9se \u00e9s v\u00e9grehajt\u00e1sa \u00e9rdek\u00e9ben.","jobTitle":"General Manager at FlexiProject","sameAs":["https:\/\/www.linkedin.com\/in\/dominik-wrzosek-929425140\/"],"image":{"@type":"ImageObject","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/03\/Dominik-Wrzosek-2.jpg","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/03\/Dominik-Wrzosek-2.jpg"}}]}},"_links":{"self":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/posts\/77044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/comments?post=77044"}],"version-history":[{"count":0,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/posts\/77044\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/autorzy\/2001"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/media\/77107"}],"wp:attachment":[{"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/media?parent=77044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/categories?post=77044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/tags?post=77044"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/flexi-project.com\/hu\/wp-json\/wp\/v2\/post_folder?post=77044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}