{"id":77020,"date":"2026-10-28T10:00:00","date_gmt":"2026-10-28T09:00:00","guid":{"rendered":"https:\/\/flexi-project.com\/?p=77020"},"modified":"2026-11-02T14:58:49","modified_gmt":"2026-11-02T13:58:49","slug":"manazeri-instalace-solarnich-systemu","status":"publish","type":"post","link":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/","title":{"rendered":"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.<\/p>\n","protected":false},"author":10,"featured_media":77082,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_meta-robots-noindex":"","footnotes":""},"categories":[652],"tags":[],"post_folder":[],"class_list":["post-77020","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energetika"],"acf":{"ikonka_strony":null,"opis_w_menu":"","nie_pokazuj":false,"sections":[{"acf_fc_layout":"blog_podsumowanie","tresc":"<ul>\n<li><strong>Mana\u017ee\u0159i instalace vlastn\u00ed stavbu, ne v\u00fdvoj.<\/strong> Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f \u0159\u00edd\u00ed f\u00e1zi fyzick\u00e9 v\u00fdstavby sol\u00e1rn\u00edho projektu, od proveden\u00ed smlouvy EPC po energizaci. V\u00fdvoj, financov\u00e1n\u00ed a komer\u010dn\u00ed provoz jsou spravov\u00e1ny jin\u00fdmi rolemi.<\/li>\n<li><strong>Role zahrnuje utility m\u011b\u0159\u00edtko, komer\u010dn\u00ed a reziden\u010dn\u00ed.<\/strong> \u0158\u00edzen\u00ed instalace vypad\u00e1 velmi odli\u0161n\u011b mezi segmenty. Mana\u017ee\u0159i utility m\u011b\u0159\u00edtka koordinuj\u00ed stovky pracovn\u00edk\u016f na v\u00edce ne\u017e 40 hektarech; reziden\u010dn\u00ed mana\u017ee\u0159i vedou mal\u00e9 \u010dety na jednotliv\u00fdch st\u0159ech\u00e1ch.<\/li>\n<li><strong>Pl\u00e1nov\u00e1n\u00ed a koordinace \u010det dominuj\u00ed den.<\/strong> Denn\u00ed pr\u00e1ce se soust\u0159ed\u00ed na p\u0159id\u011blov\u00e1n\u00ed \u010det, p\u0159\u00edpravu za\u0159\u00edzen\u00ed, koordinaci materi\u00e1l\u016f, doprovod inspektor\u016f a reportov\u00e1n\u00ed pokroku. Mana\u017eer instalace je m\u00e9n\u011b in\u017een\u00fdrem ne\u017e provozn\u00edm koordin\u00e1torem.<\/li>\n<li><strong>Bezpe\u010dnost je nevyjednateln\u00e1.<\/strong> Instalace sol\u00e1rn\u00edch syst\u00e9m\u016f zahrnuje pr\u00e1ci ve v\u00fd\u0161ce, DC elektrick\u00e9 riziko, t\u011b\u017ekou techniku a letn\u00ed tepelnou expozici. Dobr\u00fd mana\u017eer instalace pova\u017euje bezpe\u010dnost za prvn\u00ed metriku, ne za posledn\u00ed.<\/li>\n<li><strong>Spr\u00e1vn\u00e9 n\u00e1stroje n\u00e1sob\u00ed efektivitu.<\/strong> Mana\u017ee\u0159i provozuj\u00edc\u00ed v\u00edce instalac\u00ed paraleln\u011b pot\u0159ebuj\u00ed mobiln\u00ed pl\u00e1nov\u00e1n\u00ed, p\u0159\u00edstup k dokument\u016fm z m\u00edsta a reportov\u00e1n\u00ed pokroku, kter\u00e9 plyne do hlavn\u00ed kancel\u00e1\u0159e bez manu\u00e1ln\u00ed kompilace.<\/li>\n<\/ul>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Co mana\u017eer instalace sol\u00e1rn\u00edch syst\u00e9m\u016f skute\u010dn\u011b d\u011bl\u00e1<\/h2>\n<p>A solar energy installation manager is the person responsible for the physical construction of a solar power plant, from the moment the EPC contract is signed through to mechanical completion and handover for commissioning. The role is operational, not strategic: the installation manager does not negotiate PPAs, select equipment vendors, or arrange project financing. The installation manager takes the completed design and the signed contracts and turns them into an installed, inspected, working solar system.<\/p> Spolehliv\u00e1 realizace vy\u017eaduje stejnou discipl\u00ednu, na n\u00ed\u017e stoj\u00ed <a href=\"https:\/\/flexi-project.com\/cs\/obory\/energetika\/\">\u0159\u00edzen\u00ed projekt\u016f v energetice<\/a> jako celek.<p>In utility-scale solar (projects of 5 MW and above), the installation manager typically works for the EPC contractor and oversees a construction site that may span 50 to 500 acres with 100 to 500 workers across multiple trade crews. In commercial solar (100 kW to 5 MW rooftop or carport installations), the manager runs 2-5 crews across multiple active sites simultaneously. In residential solar, the role often blends with crew leader duties on a smaller scale, with one manager overseeing 10-20 installations per month.<\/p><p>What distinguishes the solar installation manager from a general construction superintendent is the technical specificity. Solar installation requires understanding DC electrical systems, module handling and warranty requirements, inverter integration, grounding and bonding, grid interconnection procedures, and performance testing protocols. A superintendent who moves from highway construction to solar needs 6-12 months of ramp-up to become genuinely effective; the solar-specific knowledge is substantial. Managers running work on <a href=\"https:\/\/flexi-project.com\/industries\/energy\/solar-farms\/\">solar farms<\/a> for the first time typically pair with experienced solar project engineers until that ramp-up is complete.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Mana\u017eer instalace vs. projektov\u00fd mana\u017eer vs. vedouc\u00ed stavby<\/h2>\n<p>These roles are often confused, particularly by people new to solar construction. The distinction matters because each role has different authority, different outputs, and different success measures.<\/p><p>The <strong>project manager<\/strong> owns the project end-to-end from the EPC contractor's perspective: schedule, budget, scope, risk, client relationship, subcontractor contracts, and profit margin. The project manager is accountable to the EPC's executive leadership and to the project owner. They make the trade-off decisions, approve change orders within their authority, and represent the project externally.<\/p><p>The <strong>installation manager<\/strong> runs the physical build. They are accountable for installing the system to specification, on the agreed schedule, within the labor budget, with zero safety incidents. They do not negotiate contracts or approve scope changes, but they implement whatever the project manager decides. The installation manager typically reports to the project manager and manages the superintendents, foremen, and crews below them.<\/p><p>The <strong>site superintendent<\/strong> is the installation manager's second-in-command on larger projects. On a 100+ MW utility-scale site, the installation manager may oversee the overall build while two or three site superintendents run specific zones or trade packages (civil works, mechanical, electrical). On smaller projects, the installation manager and site superintendent may be the same person.<\/p><p>In commercial solar (where projects are smaller and run in parallel), the roles compress. One person may act as installation manager and site superintendent for multiple small sites simultaneously, with field crew leaders handling day-to-day installation work. The structural distinction between manager and superintendent matters mainly at utility scale, where the project is large enough to justify both.<\/p>"},{"acf_fc_layout":"cta","styl":"srodek","motyw":"dark","wybor_klasy_przycisku":"btn_blue","tlo":"bg-clean","uklad_tla":"prostokat","subtytul":"Try FlexiProject!","wyroznione_slowo":"","desc":"P\u0159evezm\u011bte plnou kontrolu nad zdroji projektu, vyzkou\u0161ejte FlexiProject zdarma na 30 dn\u00ed.","zdjecie":null,"pokaz_srodowisko":true,"pokaz_kontakt":false,"glowny_przycisk":"env"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Jeden den v \u017eivot\u011b mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f<\/h2>\n<p>Typical days follow a recognizable pattern, though specifics vary by project phase and segment. The following outline reflects utility-scale installation; commercial and residential compress but keep the same basic structure.<\/p><p><strong>Pre-dawn to early morning<\/strong> is pre-shift preparation. The manager reviews the previous day's progress reports, checks weather forecasts, confirms material deliveries scheduled for the day, and reviews any safety incidents or near-misses from the previous shift. On larger projects, this preparation includes coordinating with the owner's representative and any inspectors expected on site.<\/p><p><strong>Morning stand-up<\/strong> brings together crew leaders and key subcontractors. The manager walks through the day's planned work, identifies interfaces between crews, confirms equipment availability, and surfaces any blockers. A good morning stand-up takes 15-30 minutes and leaves every crew leader clear on their day.<\/p><p><strong>Mid-morning to midday<\/strong> is active site management. The manager rotates through active work zones, verifying crew productivity, resolving interface issues between trades, coordinating with inspectors, and handling vendor coordination (deliveries, equipment issues). Depending on project phase, this may include witnessing specific installation activities that require manager presence (critical lifts, utility-adjacent work).<\/p><p><strong>Afternoon<\/strong> typically includes progress tracking and documentation. The manager updates the project schedule based on actual work completed, flags emerging schedule risks, and completes daily reports required by the EPC and owner. On large projects, this is where mobile-capable PPM software adds real value: progress recorded directly from the site flows into reports without requiring the manager to return to a trailer and reconcile paper notes.<\/p><p><strong>Late afternoon<\/strong> covers next-day planning: material staging confirmations, crew assignments, equipment reservations, safety topics for the morning briefing. A disciplined close-out of the day reduces chaos the following morning.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Hlavn\u00ed odpov\u011bdnosti: pl\u00e1nov\u00e1n\u00ed, materi\u00e1ly, bezpe\u010dnost, kvalita<\/h2>\n<h3>Crew scheduling and productivity<\/h3><p>The installation manager assigns crews to specific zones and tasks, balances crew sizes against work scope, and tracks productivity against targets. For utility-scale installations, productivity targets are typically expressed in installed kW per crew-day or modules per crew-hour. A manager tracking these numbers can predict when a project will complete and spot productivity drops early, before they become schedule problems. The <a href=\"https:\/\/flexi-project.com\/features\/project-schedule\/\">project schedule<\/a> is the manager's primary planning tool, updated based on crew productivity data each day.<\/p><h3>Materials coordination<\/h3><p>Solar installation consumes significant materials: modules (potentially tens of thousands per project), mounting hardware, inverters, cables, combiner boxes, grounding equipment. The manager coordinates deliveries so materials arrive just before they are needed. Early delivery creates storage problems and theft risk; late delivery stops crews. The manager tracks lay-down yard inventory, coordinates with the project warehouse (if separate), and escalates supplier issues that threaten schedule.<\/p><h3>Safety management<\/h3><p>Solar installation involves specific hazards: fall exposure during roof work, DC electrical risk during string connection, heat stress during summer installations, heavy equipment operation during civil works. The installation manager owns safety on site: daily safety briefings, enforcement of PPE requirements, hazard analysis for non-routine tasks, incident investigation when things go wrong. Safety metrics (OSHA recordables, near-miss reports, days without incident) are tracked visibly and reported to leadership.<\/p><h3>Quality assurance<\/h3><p>Installation quality determines plant performance over 25-30 years of operation. The manager implements the project's QA plan: visual inspections of module installation, torque verification on bolted connections, continuity and insulation testing of DC circuits, documentation of as-built configurations. Quality issues caught during installation are 10-50x cheaper to fix than ones caught during commissioning or operation.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Rozhran\u00ed: EPC, subdodavatel\u00e9, inspekto\u0159i, provozovatel s\u00edt\u011b, vlastn\u00edk<\/h2>\n<p>The installation manager coordinates with a wide range of counterparties. Each interface has its own cadence, authority structure, and failure modes.<\/p><p>With the <strong>EPC project manager<\/strong>, the installation manager provides daily progress updates, escalates issues requiring commercial decisions, and participates in weekly or biweekly project reviews. The relationship is close: the project manager's view of project health comes largely from what the installation manager reports.<\/p><p>With <strong>subcontractors<\/strong>, the installation manager manages day-to-day performance against subcontract scope. Common solar subcontractors include civil contractors (pile driving, grading, access roads), electrical subcontractors (DC string work, inverter installation, substation work), mechanical crews (module and racking installation), and specialty subcontractors (fencing, security, SCADA). The manager tracks each subcontractor's crew counts, productivity, safety record, and schedule performance.<\/p><p>With <strong>inspectors<\/strong>, the manager coordinates inspection scheduling, witnesses inspections where required, addresses findings, and documents corrective actions. Inspectors come from multiple authorities: local building inspectors for structural and electrical work, utility inspectors for interconnection-adjacent work, independent engineers hired by lenders, environmental monitors in sensitive areas.<\/p><p>With the <strong>utility<\/strong>, the manager coordinates work affecting the interconnection point: switching operations, meter installation, final energization. Utility coordination has its own rhythm (often weekly meetings during late construction) and its own documentation requirements.<\/p><p>With the <strong>project owner's representative<\/strong> (sometimes an owner's engineer, sometimes an internal construction manager hired by the owner), the installation manager hosts site walks, addresses owner concerns, and provides visibility into construction progress. On projects where the owner is active, this interface can consume 10-20% of the manager's weekly time. A disciplined <a href=\"https:\/\/flexi-project.com\/project-reviews\/\">project review<\/a> cadence keeps owner communication structured rather than ad-hoc.<\/p>"},{"acf_fc_layout":"cta","styl":"srodek","motyw":"dark","wybor_klasy_przycisku":"btn_blue","tlo":"bg-clean","uklad_tla":"prostokat","subtytul":"Try FlexiProject!","wyroznione_slowo":"","desc":"\u0158i\u010fte pracovn\u00ed z\u00e1t\u011b\u017e t\u00fdmu bez tabulek nebo chaosu, za\u010dn\u011bte pou\u017e\u00edvat FlexiProject.","zdjecie":null,"pokaz_srodowisko":true,"pokaz_kontakt":false,"glowny_przycisk":"env"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Utility m\u011b\u0159\u00edtko vs. komer\u010dn\u00ed vs. reziden\u010dn\u00ed: jak se role m\u011bn\u00ed<\/h2>\n<p>The installation manager role carries the same core responsibilities across all solar segments, but how those responsibilities play out changes significantly with project size and setting.<\/p><h3>Utility-scale installations<\/h3><p>Projects of 5 MW and above typically run for 6-18 months on a single site with 100-500 workers at peak construction. The installation manager is dedicated to one project full time and coordinates a hierarchy of superintendents, foremen, and crew leaders. Site infrastructure is substantial: project office trailers, lay-down yards, access roads, security, sometimes on-site housing in remote locations. The complexity is in coordinating many parallel work streams and managing the interfaces between civil, mechanical, and electrical crews that must sequence correctly without creating bottlenecks.<\/p><h3>Commercial installations<\/h3><p>Projects of 100 kW to 5 MW (rooftop, carport, ground-mount for commercial customers) typically run for 2-8 weeks per site. The installation manager runs multiple sites in parallel, visiting each 1-3 times per week while crew leaders handle day-to-day work. Travel becomes a significant time commitment; the manager may cover a 100-200 mile radius with 5-15 active sites at various stages. Scheduling across sites, coordinating equipment and crew movements, and maintaining consistent quality across a dispersed footprint are the main challenges.<\/p><h3>Residential installations<\/h3><p>Projects of 3-20 kW on single homes complete in 1-3 days per installation. The installation manager typically runs 10-30 installations per month, often with permanent 2-4 person crews who handle most installations without manager presence. The manager's role shifts toward crew development, quality auditing, permit coordination, and customer complaint resolution. Volume creates its own challenges: ensuring consistent quality across hundreds of annual installations, maintaining crew morale through repetitive work, and managing utility interconnection paperwork at scale.<\/p><p>Managers running mixed portfolios (e.g., a company doing both commercial and residential) need <a href=\"https:\/\/flexi-project.com\/project-programs\/\">project programs<\/a> and portfolio visibility that generic PM tools often lack. The ability to see every active installation at a glance, filter by stage or urgency, and spot patterns across the portfolio becomes essential for sustained operation.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>Metriky, kter\u00e9 stoj\u00ed za sledov\u00e1n\u00ed<\/h2>\n<p>Installation managers who track the right metrics outperform those who manage by gut feel. Six metrics cover most practical needs.<\/p><p><strong>Crew productivity<\/strong> measures installed capacity per crew-day. For utility-scale, 100-200 kW per crew-day is typical for module installation; for commercial, 20-50 kW per crew-day. Productivity varies with weather, site conditions, module format, and crew experience, so comparing against the project's own baseline matters more than against industry averages.<\/p><p><strong>Schedule performance index (SPI)<\/strong> compares actual progress against baseline schedule. SPI of 1.0 means on-schedule; 0.9 means 10% behind, 1.1 means 10% ahead. Weekly SPI tracking surfaces slippage trends early, when they can still be corrected with crew adjustments or sequence changes.<\/p><p><strong>Safety performance<\/strong> is tracked through multiple lagging and leading indicators. Lagging: OSHA recordables, lost-time incidents, days without incident. Leading: near-miss reports, safety observations completed, safety meetings attended. A manager focusing only on lagging indicators is managing after the fact; leading indicators give early warning of safety culture decline.<\/p><p><strong>Quality metrics<\/strong> include first-time inspection pass rate, punch-list item density per MW, and defect rates for specific installation elements (torque checks failed, modules damaged during handling, cable runs out of specification). Projects with strong QA generally hit >90% first-time pass rates; projects below 75% have systemic quality problems that need investigation.<\/p><p><strong>Materials and equipment utilization<\/strong> tracks module waste rate, equipment idle time, and crane utilization on utility-scale projects where cranes are a significant cost line. Managers who track these numbers catch inefficiency before it becomes a budget problem.<\/p><p><strong>Resource utilization against plan<\/strong> compares actual crew counts and labor hours against the project baseline. The <a href=\"https:\/\/flexi-project.com\/project-resources\/\">resource plan<\/a> is the baseline for this comparison; variances surface when actual crews run above or below planned headcount, triggering investigation of productivity or scope assumptions.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>N\u00e1stroje \u0159emesla<\/h2>\n<p>Modern solar installation management requires tooling that generic construction PM tools often do not fully provide. Four categories matter.<\/p><img alt=\"Interactive Gantt chart for a solar PV farm project in FlexiProject project management tool with WBS, task bars, dependencies and milestones\" class=\"wp-image-61777 size-large\" height=\"684\" src=\"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/08\/Gantt-Chart-in-the-FlexiProject-PPM-System-for-the-Energy-Industry-1024x684.webp\" width=\"1024\" \/><h3>Scheduling with mobile access<\/h3><p>Installation managers spend most of their day away from a desk. A scheduling tool that requires desktop access to update tasks forces managers to rely on paper notes during the day and reconcile them at night. Mobile-capable scheduling, where the manager can update task status, flag issues, and reassign crews directly from the field, saves hours per day and keeps the schedule current. The <a href=\"https:\/\/flexi-project.com\/features\/project-schedule\/gantt-chart\/\">Gantt chart<\/a> remains the central planning view, but mobile status updates feed it in real time.<\/p><h3>Daily reporting and progress tracking<\/h3><p>Daily reports to the EPC and owner are a universal requirement. Tools that generate reports from the schedule and progress data, rather than requiring manual compilation from spreadsheets, save the manager 1-2 hours per day. Templates for standard sections (weather, crew counts, progress by zone, safety summary, issues) allow consistent reporting without repetitive effort.<\/p><h3>Risk and issue tracking<\/h3><p>A disciplined <a href=\"https:\/\/flexi-project.com\/features\/project-management\/project-risks\/\">risk register<\/a> captures emerging issues before they become problems. The manager updates the register as risks materialize or change probability, flags escalation when needed, and uses it as the source of truth for weekly project reviews. Risk tracking integrated with the schedule shows how specific risks could affect specific tasks and milestones.<\/p><h3>Document access from site<\/h3><p>The installation manager needs access to drawings, specifications, submittals, inspection reports, and warranty documentation during site walks and crew conversations. Tools that provide searchable document access from a tablet or phone, with the current revision clearly marked, replace the pile of drawings in the trailer that is usually one revision behind.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>\u010cast\u00e9 pasti v roli mana\u017eera instalace<\/h2>\n<p>Several pitfalls recur across solar installation managers. Recognizing them early can prevent painful mistakes.<\/p><p>The <strong>only-reacting pitfall<\/strong> happens when the manager spends the entire day responding to incoming problems and never gets ahead of the work. Managers in this mode run from crisis to crisis, miss schedule warning signs, and burn out within 6-12 months. The fix is disciplined morning planning time (even 30 minutes) that sets the day's priorities before incoming problems hijack the agenda.<\/p><p>The <strong>paper-trail pitfall<\/strong> is the opposite extreme. Some managers spend so much time on documentation (daily reports, incident logs, inspection records, change order paperwork) that they rarely leave the trailer. Documentation matters, but a manager who cannot describe current site conditions in detail because they have not walked the site in two days has a different problem than imperfect reports.<\/p><p>The <strong>safety-as-afterthought pitfall<\/strong> treats safety as a compliance checkbox rather than an active management focus. These managers meet minimum safety meeting requirements but do not actively observe crew practices, correct unsafe behaviors, or model safety culture. When incidents happen (and they will), the investigation often reveals the manager was not visibly engaged with safety for weeks.<\/p><p>The <strong>subcontractor-adversary pitfall<\/strong> treats subcontractors as problems to be managed rather than partners. These managers escalate every subcontractor issue, document every performance shortcoming, and threaten contract action regularly. The short-term effect is subcontractor compliance; the long-term effect is that good subcontractors avoid bidding on future projects for that EPC.<\/p><p>The <strong>schedule-optimism pitfall<\/strong> accepts baseline schedules without pushback even when field conditions make them impossible, then reports progress optimistically to avoid delivering bad news. By the time reality catches up, the project is 20-30% behind schedule with no credible recovery plan. Honest schedule updates, even when unpopular, protect the project and preserve the manager's credibility.<\/p>"},{"acf_fc_layout":"blog_tresc","tresc":"<h2>St\u00e1t se mana\u017eerem instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: cesta a dovednosti<\/h2>\n<p>The solar installation manager role is typically reached through 5-10 years of construction experience, often with specific solar background. Several paths lead there.<\/p><p>The <strong>trade progression path<\/strong> is most common: starting as an electrician, mechanic, or civil worker on solar installations, promoting to crew leader after 2-3 years, then foreman, superintendent, and eventually installation manager. This path produces managers with deep technical knowledge and credibility with crews, but may require development on project management, documentation, and communication skills.<\/p><p>The <strong>construction management path<\/strong> brings people with general construction superintendent experience into solar. These candidates have the project management foundation but need 6-12 months of solar-specific ramp-up to understand DC electrical systems, module handling, inverter integration, and the interconnection process. Many commercial and utility-scale EPCs hire this way to fill capacity during solar boom periods.<\/p><p>The <strong>engineering transition path<\/strong> brings solar engineers with field exposure into installation management roles. These candidates understand the technical specifications deeply but need to develop crew leadership, scheduling discipline, and the operational mindset that construction demands. Not every engineer makes this transition successfully; the shift from design thinking to execution thinking is significant.<\/p><p>Certifications that help include NABCEP PV Installation Professional (US), construction management credentials (CCM, PMP for larger projects), and OSHA 30 safety certification. More important than any certification is demonstrated solar experience and a track record of projects delivered on schedule and under budget.<\/p><p>The career path after installation manager typically goes to <strong>construction director<\/strong> (overseeing multiple installation managers), <strong>operations director<\/strong> (expanding scope to full field operations), or back to <strong>project management<\/strong> at the EPC level. Some managers choose to start their own EPC or installation subcontractor business, leveraging field relationships and operational knowledge accumulated over years.<\/p>"},{"acf_fc_layout":"faq","tytul":"\u010casto kladen\u00e9 ot\u00e1zky","kategorie":null,"pozycje":[{"pytanie":"Jak\u00fd je rozd\u00edl mezi mana\u017eerem instalace sol\u00e1rn\u00edch syst\u00e9m\u016f a projektov\u00fdm mana\u017eerem sol\u00e1rn\u00edho projektu?","odpowiedz":"Projektov\u00fd mana\u017eer vlastn\u00ed obchodn\u00ed a finan\u010dn\u00ed odpov\u011bdnost za EPC projekt: rozpo\u010det, harmonogram, rozsah, rizika, vztah s klientem. Mana\u017eer instalace vlastn\u00ed fyzickou v\u00fdstavbu: \u010dety, materi\u00e1ly, bezpe\u010dnost, kvalitu, realizaci harmonogramu."},{"pytanie":"Jak\u00e9 kvalifikace mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f pot\u0159ebuj\u00ed?","odpowiedz":"V\u011bt\u0161ina mana\u017eer\u016f m\u00e1 5-10 let zku\u0161enost\u00ed ve v\u00fdstavb\u011b, \u010dasto se specifick\u00fdm sol\u00e1rn\u00edm backgroundem. Certifikace NABCEP PV Installation Professional (USA) je b\u011b\u017en\u00e1. Pov\u011b\u0159en\u00ed pro \u0159\u00edzen\u00ed v\u00fdstavby (CCM, PMP) pom\u00e1haj\u00ed u v\u011bt\u0161\u00edch projekt\u016f."},{"pytanie":"Kolik mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f vyd\u011bl\u00e1vaj\u00ed?","odpowiedz":"Odm\u011bna se v\u00fdznamn\u011b li\u0161\u00ed podle regionu, segmentu a zku\u0161enost\u00ed. V USA mana\u017ee\u0159i utility m\u011b\u0159\u00edtka obvykle vyd\u011bl\u00e1vaj\u00ed 90-150k USD. V z\u00e1padn\u00ed Evrop\u011b je b\u011b\u017en\u00fdch 55-85k EUR pro utility m\u011b\u0159\u00edtko."},{"pytanie":"Co odli\u0161uje \u0159\u00edzen\u00ed sol\u00e1rn\u00edch instalac\u00ed od obecn\u00e9 v\u00fdstavby?","odpowiedz":"Sol\u00e1rn\u00ed p\u0159id\u00e1v\u00e1 DC elektrickou slo\u017eitost (nebezpe\u010d\u00ed, testov\u00e1n\u00ed, uzemn\u011bn\u00ed), koordinaci p\u0159ipojen\u00ed s provozovateli s\u00edt\u011b, specializovanou manipulaci se za\u0159\u00edzen\u00edm a testov\u00e1n\u00ed v\u00fdkonu. Obecn\u00fd vedouc\u00ed stavby obvykle pot\u0159ebuje 6-12 m\u011bs\u00edc\u016f sol\u00e1rn\u011b specifick\u00e9ho zapracov\u00e1n\u00ed."},{"pytanie":"M\u016f\u017ee jeden mana\u017eer instalace v\u00e9st v\u00edce projekt\u016f sou\u010dasn\u011b?","odpowiedz":"V utility m\u011b\u0159\u00edtku sol\u00e1rn\u00edch je jeden projekt na mana\u017eera standardem kv\u016fli slo\u017eitosti m\u00edsta. V komer\u010dn\u00edch sol\u00e1rn\u00edch mana\u017ee\u0159i obvykle vedou 5-15 aktivn\u00edch m\u00edst paraleln\u011b. V reziden\u010dn\u00edch je 10-30 instalac\u00ed m\u011bs\u00ed\u010dn\u011b b\u011b\u017en\u00e9."},{"pytanie":"Jak\u00e9 n\u00e1stroje nejv\u00edce pom\u00e1haj\u00ed mana\u017eer\u016fm sol\u00e1rn\u00edch instalac\u00ed?","odpowiedz":"Mobiln\u00ed PPM software podporuj\u00edc\u00ed Ganttovo pl\u00e1nov\u00e1n\u00ed, registry rizik, p\u0159\u00edstup k dokument\u016fm z m\u00edsta a automatick\u00e9 reporty. FlexiProject nab\u00edz\u00ed tyto schopnosti se \u0161ablonami projekt\u016f, pl\u00e1nov\u00e1n\u00edm zdroj\u016f a portfoliov\u00fdmi pohledy."}]}],"hide_all":false,"hide_more":false,"wybor_autora":[2001]},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: role, dovednosti<\/title>\n<meta name=\"description\" content=\"Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji\" \/>\n<meta property=\"og:description\" content=\"Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/\" \/>\n<meta property=\"og:site_name\" content=\"FlexiProject\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/FlexiProject\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T09:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-02T13:58:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-energy-installation-managers-1024x572.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"572\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dominik Wrzosek\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Klaudiusz\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/\"},\"author\":{\"name\":\"Dominik Wrzosek\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#\\\/schema\\\/person\\\/044e0f4796374a2150016ce18f18503d\"},\"headline\":\"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji\",\"datePublished\":\"2026-10-28T09:00:00+00:00\",\"dateModified\":\"2026-11-02T13:58:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/\"},\"wordCount\":3134,\"publisher\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-energy-installation-managers-scaled.png\",\"articleSection\":[\"Energetika\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/\",\"name\":\"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: role, dovednosti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-energy-installation-managers-scaled.png\",\"datePublished\":\"2026-10-28T09:00:00+00:00\",\"dateModified\":\"2026-11-02T13:58:49+00:00\",\"description\":\"Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-energy-installation-managers-scaled.png\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/solar-energy-installation-managers-scaled.png\",\"width\":2560,\"height\":1429},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/manazeri-instalace-solarnich-systemu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Dom\u016f\",\"item\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/flexiproject-moderni-a-komplexni-aplikace-pro-spravu-projektu-a-portfolia-projektu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energetika\",\"item\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/category\\\/energetika\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/\",\"name\":\"FlexiProject\",\"description\":\"Project and porfolio management software | FlexiProject\",\"publisher\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#organization\"},\"alternateName\":\"FlexiProject\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#organization\",\"name\":\"FlexiProject\",\"alternateName\":\"FlexiProject\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/FlexiProject_logo_814px.png\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/FlexiProject_logo_814px.png\",\"width\":982,\"height\":1007,\"caption\":\"FlexiProject\"},\"image\":{\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/FlexiProject\",\"https:\\\/\\\/www.instagram.com\\\/flexiproject\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/flexiproject\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@flexiproject\"],\"description\":\"FlexiProject to kompleksowy program do zarz\u0105dzania projektami i portfelami projekt\u00f3w. Oferuje zespo\u0142om projektowych kompletny zestaw narz\u0119dzi, kt\u00f3re pozwalaj\u0105 zaplanowa\u0107 i skutecznie zrealizowa\u0107 dowolny projekt w organizacji, niezale\u017cnie od rozmiaru czy stopnia zaawansowania.\",\"telephone\":\"+48 22 351 13 82\",\"legalName\":\"FlexiProject Sp. z o.o. Sp.k.\",\"foundingDate\":\"2020-11-26\",\"vatID\":\"5272942612\",\"taxID\":\"387620990\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"},\"ownershipFundingInfo\":\"https:\\\/\\\/flexi-project.com\\\/it\\\/key-strengths\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/flexi-project.com\\\/cs\\\/#\\\/schema\\\/person\\\/044e0f4796374a2150016ce18f18503d\",\"name\":\"Dominik Wrzosek\",\"description\":\"Dominik je odborn\u00edk na \u0159\u00edzen\u00ed projekt\u016f a absolvent Var\u0161avsk\u00e9 polytechniky. \u0158\u00edd\u00ed v\u00fdvoj syst\u00e9mu FlexiProject a p\u0159ev\u00e1d\u00ed obchodn\u00ed pot\u0159eby do praktick\u00fdch \u0159e\u0161en\u00ed podporuj\u00edc\u00edch projektov\u00e9 t\u00fdmy. M\u00e1 zku\u0161enosti s implementac\u00ed FlexiProject v organizac\u00edch r\u016fzn\u00e9 velikosti a kombinuje technick\u00e9 znalosti s obchodn\u00edm p\u0159\u00edstupem k efektivn\u00edmu pl\u00e1nov\u00e1n\u00ed a realizaci projekt\u016f.\",\"jobTitle\":\"General Manager at FlexiProject\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/dominik-wrzosek-929425140\\\/\"],\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Dominik-Wrzosek-2.jpg\",\"contentUrl\":\"https:\\\/\\\/flexi-project.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Dominik-Wrzosek-2.jpg\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: role, dovednosti","description":"Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/","og_locale":"cs_CZ","og_type":"article","og_title":"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji","og_description":"Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.","og_url":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/","og_site_name":"FlexiProject","article_publisher":"https:\/\/www.facebook.com\/FlexiProject","article_published_time":"2026-10-28T09:00:00+00:00","article_modified_time":"2026-11-02T13:58:49+00:00","og_image":[{"width":1024,"height":572,"url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-energy-installation-managers-1024x572.png","type":"image\/png"}],"author":"Dominik Wrzosek","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Klaudiusz"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#article","isPartOf":{"@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/"},"author":{"name":"Dominik Wrzosek","@id":"https:\/\/flexi-project.com\/cs\/#\/schema\/person\/044e0f4796374a2150016ce18f18503d"},"headline":"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji","datePublished":"2026-10-28T09:00:00+00:00","dateModified":"2026-11-02T13:58:49+00:00","mainEntityOfPage":{"@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/"},"wordCount":3134,"publisher":{"@id":"https:\/\/flexi-project.com\/cs\/#organization"},"image":{"@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#primaryimage"},"thumbnailUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-energy-installation-managers-scaled.png","articleSection":["Energetika"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/","url":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/","name":"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: role, dovednosti","isPartOf":{"@id":"https:\/\/flexi-project.com\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#primaryimage"},"image":{"@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#primaryimage"},"thumbnailUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-energy-installation-managers-scaled.png","datePublished":"2026-10-28T09:00:00+00:00","dateModified":"2026-11-02T13:58:49+00:00","description":"Kompletn\u00ed pr\u016fvodce rol\u00ed mana\u017eera instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: odpov\u011bdnosti, rozhran\u00ed, metriky, n\u00e1stroje, kari\u00e9rn\u00ed cesty a rozd\u00edly mezi segmenty.","breadcrumb":{"@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#primaryimage","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-energy-installation-managers-scaled.png","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2026\/10\/solar-energy-installation-managers-scaled.png","width":2560,"height":1429},{"@type":"BreadcrumbList","@id":"https:\/\/flexi-project.com\/cs\/manazeri-instalace-solarnich-systemu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Dom\u016f","item":"https:\/\/flexi-project.com\/cs\/flexiproject-moderni-a-komplexni-aplikace-pro-spravu-projektu-a-portfolia-projektu\/"},{"@type":"ListItem","position":2,"name":"Energetika","item":"https:\/\/flexi-project.com\/cs\/category\/energetika\/"},{"@type":"ListItem","position":3,"name":"Mana\u017ee\u0159i instalace sol\u00e1rn\u00edch syst\u00e9m\u016f: praktick\u00fd pr\u016fvodce rol\u00ed, odpov\u011bdnostmi a n\u00e1stroji"}]},{"@type":"WebSite","@id":"https:\/\/flexi-project.com\/cs\/#website","url":"https:\/\/flexi-project.com\/cs\/","name":"FlexiProject","description":"Project and porfolio management software | FlexiProject","publisher":{"@id":"https:\/\/flexi-project.com\/cs\/#organization"},"alternateName":"FlexiProject","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/flexi-project.com\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/flexi-project.com\/cs\/#organization","name":"FlexiProject","alternateName":"FlexiProject","url":"https:\/\/flexi-project.com\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/flexi-project.com\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/02\/FlexiProject_logo_814px.png","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/02\/FlexiProject_logo_814px.png","width":982,"height":1007,"caption":"FlexiProject"},"image":{"@id":"https:\/\/flexi-project.com\/cs\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/FlexiProject","https:\/\/www.instagram.com\/flexiproject\/","https:\/\/www.linkedin.com\/company\/flexiproject\/","https:\/\/www.youtube.com\/@flexiproject"],"description":"FlexiProject to kompleksowy program do zarz\u0105dzania projektami i portfelami projekt\u00f3w. Oferuje zespo\u0142om projektowych kompletny zestaw narz\u0119dzi, kt\u00f3re pozwalaj\u0105 zaplanowa\u0107 i skutecznie zrealizowa\u0107 dowolny projekt w organizacji, niezale\u017cnie od rozmiaru czy stopnia zaawansowania.","telephone":"+48 22 351 13 82","legalName":"FlexiProject Sp. z o.o. Sp.k.","foundingDate":"2020-11-26","vatID":"5272942612","taxID":"387620990","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"},"ownershipFundingInfo":"https:\/\/flexi-project.com\/it\/key-strengths\/"},{"@type":"Person","@id":"https:\/\/flexi-project.com\/cs\/#\/schema\/person\/044e0f4796374a2150016ce18f18503d","name":"Dominik Wrzosek","description":"Dominik je odborn\u00edk na \u0159\u00edzen\u00ed projekt\u016f a absolvent Var\u0161avsk\u00e9 polytechniky. \u0158\u00edd\u00ed v\u00fdvoj syst\u00e9mu FlexiProject a p\u0159ev\u00e1d\u00ed obchodn\u00ed pot\u0159eby do praktick\u00fdch \u0159e\u0161en\u00ed podporuj\u00edc\u00edch projektov\u00e9 t\u00fdmy. M\u00e1 zku\u0161enosti s implementac\u00ed FlexiProject v organizac\u00edch r\u016fzn\u00e9 velikosti a kombinuje technick\u00e9 znalosti s obchodn\u00edm p\u0159\u00edstupem k efektivn\u00edmu pl\u00e1nov\u00e1n\u00ed a realizaci projekt\u016f.","jobTitle":"General Manager at FlexiProject","sameAs":["https:\/\/www.linkedin.com\/in\/dominik-wrzosek-929425140\/"],"image":{"@type":"ImageObject","url":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/03\/Dominik-Wrzosek-2.jpg","contentUrl":"https:\/\/flexi-project.com\/wp-content\/uploads\/2024\/03\/Dominik-Wrzosek-2.jpg"}}]}},"_links":{"self":[{"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/posts\/77020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/comments?post=77020"}],"version-history":[{"count":0,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/posts\/77020\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/autorzy\/2001"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/media\/77082"}],"wp:attachment":[{"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/media?parent=77020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/categories?post=77020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/tags?post=77020"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/flexi-project.com\/cs\/wp-json\/wp\/v2\/post_folder?post=77020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}